LYCOMING OPERATOR’S MANUAL
SECTION 7
IO-320 SERIES
INSTALLATION AND STORAGE
Exterior Surfaces
surfaces should be coated with soft film
corrosion preventative compound (E.F. Houghton and Company, Cosmoline 1059 or equivalent). The starter
ring gear and propeller mounting surfaces in particular should receive a liberal coating of the compound.
Fuel Injector
returned for overhaul, must be flushed with
preserving oil (Specification MIL-O-6081, Grade 1010), using the following procedure.
Remove plugs and drain all fuel oil from the injector. If available, apply 10 to 15 psi air pressure to the
fuel inlet, until all fuel is discharged from the injector.
Replace plugs and apply flushing oil filtered through a 10 micron filter at 13 to 15 psi to the fuel inlet until
oil is discharged from the servo line.
Replace fuel inlet plug.
CAUTION
DO NOT EXCEED THE RECOMMENDED AIR PRESSURE AS INTERNAL DAMAGE TO
THE INJECTOR MAY RESULT.
After filling with preservative oil the injector should be protected from dust and dirt, and given such
protection against moisture as climatic conditions at the point of storage require.
The injector shall be tagged as follows: The fuel chambers and passages of this fuel injector were
preserved with oil conforming to Specification MIL-O-6081, Grade 1010. Before using de-preserve in
accordance with instructions
Shipping Case
ngine should be secured in a suitable engine
shipping container. The date of preservation and the following legend should be legibly marked on the side
of the container:
“On
(Date)
the engine was preserved for 60 days short term storage with preservative
oil and cylinder and crankcase dehydrator plugs shall be inspected on arrival at destination
or 30 days after the above date (whichever occurs sooner) to determine of renewal of the
dehydrating agent is necessary.”
4. RECOMMENDED PROCEDURE FOR RE-PRESERVATION.
The engine shall be examined every 30
days (or less, depending on weather and locality). If any evidence of corrosion is present, the affected area
should be cleaned free of corrosion and the engine re-preserved.
Engines prepared in the preceding manner are not adequately protected for extended periods of storage. If
at the end of 60 days, it is found that the engine must remain in storage for an additional period, the engine
must be re-preserved according to the foregoing procedure.
NOTE
Inspection and re-preservation will not be the responsibility of the engine manufacturer after
engines have been shipped from the engine manufacturer’s plant. It shall be the
responsibility of the consignee to put engines into service in the order of storage preparation
date to reduce the storage period to a minimum
7-3
Содержание AIO-320
Страница 9: ...LYCOMING OPERATOR S MANUAL vi ...
Страница 11: ...This Page Intentionally Left Blank ...
Страница 15: ...This Page Intentionally Left Blank ...
Страница 17: ...This Page Intentionally Left Blank ...
Страница 23: ...This Page Intentionally Left Blank ...
Страница 32: ...LYCOMING OPERATOR S MANUAL SECTION 3 IO 320 SERIES OPERATING INSTRUCTIONS IO 320 A E Series 3 9 ...
Страница 33: ...SECTION 3 LYCOMING OPERATOR S MANUAL OPERATING INSTRUCTIONS IO 320 SERIES IO 320 A Series 3 10 ...
Страница 34: ...LYCOMING OPERATOR S MANUAL SECTION 3 IO 320 SERIES OPERATING INSTRUCTIONS IO 320 E Series 3 11 ...
Страница 36: ...LYCOMING OPERATOR S MANUAL SECTION 3 IO 320 SERIES OPERATING INSTRUCTIONS IO 320 B D AIO 320 LIO 320 3 13 ...
Страница 37: ...SECTION 3 LYCOMING OPERATOR S MANUAL OPERATING INSTRUCTIONS IO 320 SERIES IO 320 C Series LIO 320 C 3 14 ...
Страница 38: ...LYCOMING OPERATOR S MANUAL SECTION 3 IO 320 SERIES OPERATING INSTRUCTIONS IO 320 C Series LIO 320 C 3 15 ...
Страница 39: ...This Page Intentionally Left Blank ...
Страница 41: ...This Page Intentionally Left Blank ...
Страница 47: ...This Page Intentionally Left Blank ...
Страница 59: ...This Page Intentionally Left Blank ...
Страница 65: ...This Page Intentionally Left Blank ...
Страница 70: ...LYCOMING OPERATOR S MANUAL SECTION 7 IO 320 SERIES INSTALLATION AND STORAGE Figure 7 2 Fuel Injector 7 5 ...
Страница 71: ...SECTION 7 LYCOMING OPERATOR S MANUAL INSTALLATION AND STORAGE IO 320 SERIES Figure 7 3 Magneto Connections 7 6 ...
Страница 74: ...LYCOMING OPERATOR S MANUAL SECTION 7 IO 320 SERIES INSTALLATION AND STORAGE 7 9 ...
Страница 75: ...SECTION 7 LYCOMING OPERATOR S MANUAL INSTALLATION AND STORAGE IO 320 SERIES 7 10 ...
Страница 77: ...This Page Intentionally Left Blank ...
Страница 79: ...SECTION 8 LYCOMING OPERATOR S MANUAL TABLES IO 320 SERIES 8 2 ...
Страница 80: ...LYCOMING OPERATOR S MANUAL SECTION 8 IO 320 SERIES TABLES 8 3 ...