![LXNAV eCopilot10 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/lxnav/ecopilot10/ecopilot10_system-installation-manual_1953405011.webp)
Installation and Configuration
Version 1.02, January 2019
Page 11 of 25
6
Installation and Configuration
6.1
Main Unit and Repeater Unit
Before cutting out the panel the whole cutting plan of the panel, including all indicators,
must be prepared. The next figure shows the cut-outs for all types of units that can be
installed into the panel.
Prepare the cut-out in the instrument panel according to the drilling template or DWG
document. Position the unit in the cut-out in the instrument panel. Tighten the unit with
attached 2.5 mm screws.
6.1.1
Installation of Options
6.1.2
Cut-Outs
6.1.2.1
eCopilot10
Drawing is not to scale