STEP 4
H
Q
M
S
P
G
STEP 3
K
A
L
B
C
D
STEP 1
Instruction Sheet
Adjustable Height Steel
Computer Workstation
Model LCT5A
Customer Service Dept.
2245 Delany Rd.
Waukegan, IL 60087
Ph: 847/244-1800 • 800/323-4656
Fax: 847-244-1818 • 800/327-1698
Instructions for Assembly
We suggest you unpack all components from the container before
assembling the table. Separate the parts using the parts list on
back side as a guide. Report any shortages immediately.
Step 1
Assemble left and right
side panels per diagram
#1.
Step 2
Connect the frames as
shown in diagram #2.
Step 3
Assemble runners for
mouse shelf.
Step 4
Install the mouse shelf
and CPU holders.
Step 5
Install top and bottom fixed shelves,
keyboard shelf and printer shelf.
Tighten all fasteners. Adjust table to
desired height.
4/99
E
E
STEP 2
STEP 5
U
T
V
F
W