SP25-SS
Rev. A2 112017
8
Luxier
Installation (cont.)
5.
Apply thread sealant tape to the thread-
ing on the shut off valves before connect
both hot and cold water supply hoses to the
valves.
IMPORTANT :
- Make sure the water supply hoses are
connected to the corresponding valves -
i.e. cold water hose to the cold water valve
and the same for hot water hose. The
mixing valve will not function properly if the
hoses are installed incorrectly.
- Before hanging the shower panel on
the wall. Turn on both valves and test all
functions on the shower panel and check
for leaks at this point. You should have
good water flow to the shower panel and
full temperature control from the knobs.
4. Secure the mounting brackets to the wall.