7-1 Salt measurement
1) Prepare the Conductivity Probe ( included, CDPB-03 ),
install the " Probe Plug " ( 7-1, Fig. 4 ) into the
" CD Socket " ( 3-15, Fig. 1 ).
2) Power on the meter by pressing " Power Button "
( 3-2, Fig. 1 ) once.
Select the Meter's measurement Function to " SALt "
( Conductivity measurement )
3) Hold the " Probe Handle " ( 7-2, Fig. 4 ) by hand
and let the " Sensing head " ( 7-3, Fig. 4 )
immersed wholly into the measured solution. Shake
the probe to let the probe's internal air bubble drift
out from the sensing head.
Display will show the Salt values ( % weight ).
7-2 Calibration
If the conductivity range already make the calibration
completely then the Salt measurement is not necessary to
make the calibration again.
24
Содержание YK-2001PHA
Страница 12: ...3 FRONT PANEL DESCRIPTION Fig 1 10 ...