Protection treatment

 

The timber used for the products LUOMAN products has not been treated. Protection treatment 

of the building must be performed immediately after erecting the cabin as soon as the weather 

is suitable for it. The first treatment should be done with a with a colorless wood preservative 

that prevents the formation of mould and blue stain. Also, the interior of the building must be 

treated. Only use wood preservatives that are suitable for log surfaces. Ask for advice of 

suitable products from resellers of wood preservatives. 
 
Small black or blue mould spots may easily be formed both on treated and untreated wooden 

surfaces in certain conditions. A mould spot is not harmful for the wood nor a defect. It is only 

an aesthetic problem that can usually be washed away similarly as dirt. It is also possible to 

sand the spots before the surface treatment. 
 

Maintenance

 

Safe long-term use of the building requires regular checking, possible reparation of the 

fastenings and inspecting the condition of the parts. Pay special attention to the roof 

construction, its covering material, doors and windows, foundation fastenings, the protection 

against storm as well as surface treatment of any wooden parts. Failure to perform regular 

maintenance can cause damage to the building or a safety risk to its user. 
 
Regularly inspect the condition of the protection treatment and re-new it when necessary. 

Inspect the bottom rails of the doors, windows and their frames, end surface of timbers and 

parts stressed by hard weather- or usage-related wearing. Check the functioning of doors and 

windows and adjust hinges when necessary. Check the silicon seals of doors and windows, 

renewing them when necessary. It is very important to make sure that underneath the 

building is well-ventilated. Also installing ventilation grills (not included) on top of the gable 

triangles is recommended to let moisture get out from the building. 

 

ID 7889, Versio 2, Pvm 12/1/2020, Luoman 724

Содержание 724

Страница 1: ...Important Keep the number Guarantee number Controlled by Luoman 724 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 2: ...ssion is required before beginning construction Receiving and storing the goods Machined logs and other parts have been packed into protective wrapping If the item will not be constructed immediately it should be kept indoors or otherwise well protected until assembly The package should be kept away from the ground in order to avoid absorbing moisture and be stored on a level base Transport defect...

Страница 3: ... building is fit for its intended use Constructing this building requires expertise and thorough knowledge concerning the building and construction regulations The builder is expected to comply with good building practices If needed seek advice from experts and construction sector professionals The assembly instructions include a parts list drawings of wall constructions and the required detail dr...

Страница 4: ...ructure Doors and windows In principle doors and windows can be added to the building or their places changed Contact the reseller Use an insulator allowing settling when filling the gaps It is not allowed to use polyurethane foam One spare log is included in the delivery This spare log is intended to be used if a log has a machining defect or is otherwise damaged or of the wrong size The spare lo...

Страница 5: ...nce Safe long term use of the building requires regular checking possible reparation of the fastenings and inspecting the condition of the parts Pay special attention to the roof construction its covering material doors and windows foundation fastenings the protection against storm as well as surface treatment of any wooden parts Failure to perform regular maintenance can cause damage to the build...

Страница 6: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 7: ...indow 1196x880 door 795x1890 window 1196x880 window 646x880 window 1196x880 door 895x1990 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 8: ...g point 0 00 an extra beam or a supporting point under every floor beam must be added if the load on the floor exceeds 0 8 kN m2 e g 50x150 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 9: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 10: ...escription Drawn by Luoman Puutuote Oy Date Scale not to scale Overlap of wall from foundations 5mm Note Leave a space in the foundations for the threaded rods if needed ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 11: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 12: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 13: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 14: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 15: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 16: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 17: ...L5 L6 L6 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 18: ...L8 L7 Position of the supporting post of the roof purlin Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 19: ...40x50 19x95 19x95 4 5x50 roofing material roof board 19x95 19x95 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale not included ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 20: ...not to scale Beam shoe fixed with 5x40mm anchor screws Floor board 28mm fixed with 1 7x45 nails Floor beams 40x145 c c600 Floor beams next to the walls fixed to the logs with 5x80mm screws 8 pcs beam Waterproofing e g bitumen stripe ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 21: ...ct Description Drawn by Luoman Puutuote Oy Date Scale not to scale Settling space 60 70mm insulation Trim fixed with 4x40mm screws to the frame Top frame treshold skirtingg floor board not included ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 22: ...frame insulation not included Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale trim screw 4x40mm ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 23: ... not included Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale frame trim fixed with 4x40mm screws to the frame insulation ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 24: ...Space for settling 60 70MM insulation lK Trim fixed to the frame with 4x40MM screws Top frame ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 25: ...A5 KA5 KA4 KA4 KA3 KA2 KA2 B2 Loft floor beams Beam shoe fixed with 5x40 screws 5x80 5x80 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 26: ...le parts P4 with 6x90 screws and the steps with 4 5x70 scews Fix the stairs to the wall with sliding brackets and 5x40 screws Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 27: ...1865 7 Log D3 70 135 1000 7 Log E1 F1 70 135 4100 13 Log E2 70 135 350 15 Log E3 70 135 1400 15 Log E4 70 135 630 15 Log E5 70 135 4100 1 Log E6 70 135 1333 2 Log drilled F2 70 135 2450 7 Log drilled F3 70 135 965 7 Gable triangle log drilled D4 70 135 3760 1 Gable triangle log D5 70 135 3506 1 Gable triangle log D6 70 135 2998 1 Gable triangle log D7 70 135 2491 1 Gable triangle log D8 70 135 198...

Страница 28: ...t batten for roof boards running meters R2 40 50 3 3m 4 Trims for doors and windows running meters I4 19 95 2200 38 Trim for door opening running meters I5 19 70 2200 3 Stairs right side P1A 34 145 2375 1 Stairs left side P1B 34 145 2375 1 Steps for the stairs P2 34 145 475 7 Handrail for stairs P3 40 50 2500 2 Middle part for handrail P4 40 50 150 6 Door type C24 O1 816 1917 1 Side frame hinge si...

Страница 29: ...er log The screws shown in the wall drawings are installed as advised here Drill a starting hole to the log with the drill from the accessories bag according to the measurements and drawings shown here Drill the hole perpendicularly You can drill the holes before you lift the logs in place ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Страница 30: ... 150mm 50mm Obey the minimum distances shown in the drawings The holes must be drilled perpendicularly ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...