Lunos Skalar Series Скачать руководство пользователя страница 6

6  

 

Fit the clamped-ventilator insert in the wall 
cut-out: 

• 

Insert the ventilator unit in the wall cut-out 
(correct flap valve position and seating if ap-
propriate! See the bottom diagram)  

 
 
 
 
 
 
 
 
 

Insertion in through-the-wall housings

      

3/LS, 3/LB, 3/LS 2, 3/LB 2:

  

• 

Push the ventilator unit in the through-the-
wall housing while pressing the mains cable 
back in the duct

 

 

4a

 

  

Mains Connection: 

Fasten the power supply terminal to the mains 
cable as shown in the appropriate wiring dia-
gram (see “Wiring diagrams”). 
 

Caution

! The mains cable must be dead! 

2

 

Top view of power 
supply terminal 

L2 

L1 

F+ 

F- 

Plug the power supply terminal on and 
latch on behind the notched hook 

3

 

Lock the power supply 
terminal in behind the 
notched hook 

4b

 

Correct the flap valve position and seating 

(important for ceiling installation) 

• 

In the installed condition, the flap valve in the 
exhaust nozzle must close because of its 
own  weight. The flap valve can be drawn out 
from the inside for corrections. 

Right 

Wrong 

Flap valve 

‘‘DOWN‘‘ 

inscription 

Correction 

Break off the 
guide stems 

Mains cable 

Installation 
housing 

Stick seal to exhaust 
opening (see dia-
gram  1 )! 

Push the ex-
haust nozzle on 
to the stop 

Duct 

Содержание Skalar Series

Страница 1: ...recautions and safety symbols with notes in the text must be observed When installation has been completed pass these directions on to the user renter owner block manager or other Symbols in these directions Danger Assembly work is only to be carried out on the ventilator when it is separated from the line voltage The ventilator is protectively insulated to protective class II the protective condu...

Страница 2: ...with a Class G2 EN 779 filter and a filter change display Ventilators of the Silvento series fulfil all requirements of DIN 18017 3 Allgemeine Bauaufsichtliche Zulassung Z 51 1 215 for low voltage CE acc to EC Directives 2006 95 EG for electromagnetic compatibility CE acc to EC Directives 2004 108 EG Waste disposal Sort the packaging for appropriate disposal Observe current requirements should you...

Страница 3: ...housings 260 mm 32 mm 69 mm 120 mm Grip 1 bis 42 mm Grip 2 ab 57 mm No grip possible bet ween 42 and 57 mm 25 5 mm 206 mm Flap valve Through the wall housing Caution Correct the flap valve position and seating if appropriate see page 5 Dimensional drawings Possible installation positioning for duct mounting ...

Страница 4: ...lation in housing 3 LS or 3 LB 2 UP Clamped ventilators can replace all build in versions of the Skalar series These installation examples are therefore only a few of many possibilities Installation in housing 3 LB 2 room ventilator Installation in housing 3 LS Installation examples ...

Страница 5: ... stick on 1a Check delivery for completeness and undamaged condition Filter Front cover plate Grid cover frame Ventilator insert for clamped ventilator Incl screws for connecting grid cover frame to ventilator insert Seal stick on when replacing a Skalar V Power supply terminal Sound insulation not with 2 room ventilators Slide nozzle with flap valve for rising building 1 Installation of clamped v...

Страница 6: ...ng diagrams Caution The mains cable must be dead 2 Top view of power supply terminal L2 L1 L N F F Plug the power supply terminal on and latch on behind the notched hook 3 Lock the power supply terminal in behind the notched hook 4b Correct the flap valve position and seating important for ceiling installation In the installed condition the flap valve in the exhaust nozzle must close because of it...

Страница 7: ...over frame and front cover plate according to the built in position of the ventilator 5 6 Flange bore holes 4 x Clamp Filter Front cover plate Grid cover frame Fitting the motion detector circuit board to the decor plate Plug the display board cable in Fasten the grid cover frame to the ventilator insert with the screws supplied and align it so that the cable lies under the motion detector circuit...

Страница 8: ...pes 100ZII Continuous operation 40 m3 h with run out time controlled 100 m3 h switch off in each of 2 rooms Ventilator types 30 100ZII 7 6 With remote control ventilator types F Note Other circuits e g via L1 or L2 are possible Remote control always has priority 0 2 V 2 4 V 4 6 V 6 8 V 8 10 V 10 12 V Ventilator operation acc to switch position Ventilator OFF 30 m h 40 m h 50 m h 60 m h Room 1 60 m...

Страница 9: ...x haust air volume flow to the room air humidity and room tempera ture it guarantees optimum comfort in the room to be ventilated In this way only as much ventilation as necessary but as little ventilation as possible is ensured and thus energy is saved The fan never switches off completely in order to ensure a minimum air change During summer months the increased exterior air hu midity does not m...

Страница 10: ...ec Run out time 15 min Inverse operation OFF Interval switching OFF White toggle switch Remove cap with a screwdriver Electrics housing Cap Interval ON every 4 hrs for 30 min Interval OFF Run out time 15 min Run out time 6 min Inverse operation 30 min after run down after the room is left Inverse operation OFF Switch on delay 120 sec Switch on delay 0 sec Accessory and replacement parts Filter pac...

Отзывы: