8
Note: Four hubs can be connected together. All they need is power connected, and a pre-moulded data
cable run between the hubs (see connecting multiple hubs section for wiring diagram).
Installing the Hub(s)
1. Select a site for the installation of the SUPRA i-Connect Hub(s). This should be within reach of the light
cables that will be attached to the hub(s). The hub(s) should be in a dry, well ventilated area. The hub(s)
should NOT be mounted in areas prone to flooding or excess heat.
2. The hub(s) should be mounted to a flat surface, with room for access to the fuse panel and connectors.
3. Mount the hub(s) as close to the power source as possible. Run the power cable to the hub(s) from the
power source.
4. Remove the clear fuse panel and insert the fuses (supplied):
12V DC
7.5A
24 V DC
4A
Once the fuses are in place replace the fuse panel.
5. Select a position for the SUPRA i-Connect Switch. Mount the switch and run the cable to the hub. Con-
nect the switch connector to the hub. The switch cable can be extended up to 50m. To extend, cut the
switch cable, and connect in a 18 AWG, 3 core cable of the desired length. Take care to ensure that the
correct conductors are connected together.
6. Add the field installable connector to the light cables (supplied). The light cables need to be cut back to
reveal the third (data) wire.
Trim back the insulation on each core to reveal 4mm of wire.
Cut the cable just below the
heat shrink. Remove the outer
insula�on to reveal the yellow
wire