background image

Installation Instructions - Kurba Pixel

Models KBL-F-V-SPI and KBM-F-V-SPI

Please read all instructions prior to installation and keep for future reference!

1. 

PRODUCT TO BE INSTALLED BY A QUALIFIED ELECTRICIAN.

2. 

USE ONLY WITH CLASS 2 POWER UNIT

3. 

24 VOLTS DC

4. 

SUITABLE FOR WET LOCATIONS

5. 

SURFACE MOUNT ONLY

7777 Merrimac Ave

Niles, IL 60714

T 224.333.6033

F 224.757.7557

[email protected]

www.luminii.com

REV0.4

08012022

/

 6

*LUMINII RESERVES THE RIGHTS TO CHANGE SPECIFICATION & INSTRUCTION WITHOUT NOTICE

1

KURBA 

Body

8”away

(maximum)

1.1

Once the location or pattern is determined for Kurba to be installed, start off by marking the area. Amount of brackets may vary dependant upon pattern. Reference 

diagrams below.

A.1

Line up the spring clips to the mounting holes, followed by placing the mounting channel to the surface. Make sure its straight by using a level.

A.2

Secure channel to the surface by tightening all the provided screws. If mounting to something other than wood, we recommend using the proper hardware.

B.1

Determine the shape of the Kurba layout, then mark thel pattern onto the surface. Then, place a mounting bracket every 8”(minimum). 

The pattern may vary dependant upon the amount of curves.

B.2

Secure the mounting brackets to the surface by tightening the screw. If mounting to something other than wood, we recommend using 

the proper hardware.

NOTE: 

Prior to installation all 24VDC wires must be present within 72” of the installation. Refer to the power supply 

installation instruction for additional information.

NOTE: 

More than one person is recommended for this installation.

A.1

Straight run with mounting channel

Curved run with mounting channel

mounting

channel

spring clip

endcap

mounting channel

mounting

bracket

screw

B .2

Отзывы: