![Lumi-O InnovaPlas Aquarius Deck 5010 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/lumi-o/innovaplas-aquarius-deck-5010/innovaplas-aquarius-deck-5010_manual_1948499003.webp)
REV. 02/26/2020 PN:
PG:3
2257 route 139
Drummondville, Québec
J2A 2G2
WWW.INNOVAPLAS.COM
AQUARIUS DECK 5010
H
I
J
1 year on pool step.
1 year on hardware.
MANUFACTURER WARRANTY
2)
Once the step is in the pool,
measure as illustrated.
3)
Insert the short post into the
post end and screw together
with the screw provided.
4) Cut the short post based on
the measurement taken in step
#2. BE SURE TO CUT 3/4”
SHORTER THAN THE
MEASUREMENT TO ALLOW
INSTALLATION OF THE POST
COVER.
x3
MEASURE
3/4”
MEASURE
CUTTING
LINE
1)
Once the step has been entirely submerged, put it in place, with the
deck supports resting on the deck.
1)
Slide the second
deck support onto
the short post.
2)
Affix the deck
supports to the deck
with the screws
supplied.
3)
Install the post covers
on both the short post
and handrail assembly.
1)
Pull the deck supports (already fixed to the deck)
upwards to create a spring effect on the step.
2)
Fasten the supports to the two rear posts while
pushing the entire step downwards.
x4
D
D
D
F
F
x12