`
Figure: 10 shows the harness
connections. The harnesses will
plug together by size of plug and
color to color plug ins. Once
plugged together, put a tie wrap
around plug to help from
possibility of coming apart.
Figure: 10
Page:
5 of 15
Total Task Time:
N/A
31-Open
Rigging Manual
Figure: 11
Figure: 11 is showing the
Glendinning electronic control
hook up.
Figure: 12 is showing the
steering lines hook up. The Port
line will be marked with Red tape
and the Starboard will be marked
with Green tape. Station to
Station will be black.
Figure: 12