TEL:400-860-9760
www.Ludwig-Schneider.com.cn
EN
7
0
1
7
8
7
2
.0
6
0
9
/2
0
1
8
C
H
/E
N
When installing the container table, you should refer to the minimum distance between
the instruments recommended in the above figure to ensure the necessary heat
dissipation and loading and unloading space.
Note:
8.3 Instrument Installation
installation hole. The thickness of the installation panel is (1.5 ~ 4.5) mm.
Note:
Step 2: Use the mounting bracket provided with the instrument to install it as shown in the
figure above (one bracket is installed on each side of the instrument, and the screws
used for the
Installation method:
instrument panel mounting bracket are M3 standard screws).
Step 1: Push the meter from the front of the installation panel (please use steel plate) into
the
Step 3: After the meter body is installed, you can connect the signal cable and the power
cable.
When installing this instrument, please do not tilt it to the left and right, try to install it
horizontally (it can be tilted back <30 °)
Dash board
F
ro
n
t p
a
n
e
l
Mounting
screws
screwdriver
Mounting brackets
8.4 Instrument Wiring
8.4.1 Wiring method
It is recommended to use U-shaped crimp terminals with insulation sleeves (the
terminals are M3.5 screws).
Crimp terminal with insulating sleeve
07