background image

Page 4 / June 2022

Installation, Operation and Maintenance Instructions 

Weather-proof louvre, horizontal,  

WSG-H3 for flat roof

3   Mounting frame for horizontal weather-proof louvre in flat roof 

construction (optional)

The mounting frame for fitting the horizontal weather-proof 

louvre WSG-H3 on flat roof constructions is optionally 
available on order and is manufactured to measure de-
pending on the building.

The mounting frame is pre-fabricated and is delivered 

knocked-down including fastening materials. The purchas-
er must assemble it on site. Detailed assembly instructions 
for the mounting frame are available at www.lucoma.ch.

In principle, weather-proof louvres and the system-com-
patible mounting frames can be used for all flat roof sys-
tems. The two most frequent flat roof types are used as 
examples in these assembly instructions. The two sets of 

instructions can be taken to derive all other flat roof types. 
If you are in any doubt, please contact the specialists at 
LUCOMA who are available to process your requests.

4 Roof systems

4.1  Warm roof 

(classic flat roof construction)

4.2  Insulation, wet-side 

(inverted roof)

a) Warm roof (classic flat roof construction)

MST 1:10,   Format Din A4, Gez. ma 07.01.2019

E

D

C

B

A

E   Substructure / support structure 

      (e.g. steel structure)

D   Vapour barrier / air seal

A   Protection / wearing surface
B   Seal
C   Heat insulation / impact sound

a) Warm roof (classic flat roof construction)

MST 1:10,   Format Din A4, Gez. ma 07.01.2019

E

D

C

B

A

E   Substructure / support structure 

      (e.g. steel structure)

D   Vapour barrier / air seal

A   Protection / wearing surface
B   Seal
C   Heat insulation / impact sound

E   Substructure / support structure 

      (e.g. concrete structure)

B   Water film rupturing / permeable layer

b) Insulation, wet-side (inverted roof)

MST 1:10,   Format Din A4, Gez. ma 07.01.2019

A   Protection / wearing surface

D   Seal

C   Heat insulation, wet-side

E

D

C

B

A

E   Substructure / support structure 

      (e.g. concrete structure)

B   Water film rupturing / permeable layer

b) Insulation, wet-side (inverted roof)

MST 1:10,   Format Din A4, Gez. ma 07.01.2019

A   Protection / wearing surface

D   Seal

C   Heat insulation, wet-side

E

D

C

B

A

Содержание WSG-H3

Страница 1: ...2 Installation in warm roof construction 7 a WSG H3 Fu 7 bottom flange without duct connection drainage over roof b WSG H3 Fu KA 8 bottom flange with duct connection drainage over roof c WSG H3 Fo 9 top flange without duct connection internal drainage by pipes d WSG H3 Fo KA 10 top flange with duct connection internal drainage by pipes 5 3 Installation in inverted roof construction wet side insula...

Страница 2: ...the roof due to insufficiently secured roof accesses skylights weather proof louvres etc If one of the items below applies roof accesses must have a shatter proof design 1 The building area is freely accessible to third parties 2 Technical equipment that requires regular maintenance e g more than once yearly e g vents solar systems etc are located on the roof 3 The roof is intensively or extensive...

Страница 3: ...of The weather proof louvre can be used on all flat roof types with a pitch of 0 35 Drainage is over roof The louvre is also equipped at the base with a duct connec tion 2 3 WSG H3 Fo top flange without duct connection internal drainage by pipes The weather proof louvre can be used on all flat roof types with a pitch of 0 35 Drainage is by internal drain pipes 2 4 WSG H3 Fo KA top flange with duct...

Страница 4: ...ts of instructions can be taken to derive all other flat roof types If you are in any doubt please contact the specialists at LUCOMA who are available to process your requests 4 Roof systems 4 1 Warm roof classic flat roof construction 4 2 Insulation wet side inverted roof uction MST 1 10 Format Din A4 Gez ma 07 01 2019 E D C B A E Substructure support structure e g steel structure D Vapour barrie...

Страница 5: ...sisting of sev eral louvres the customer also requires an additional sup porting structure for the peripheral water channel or at the point where the multiple louvres abut The designing engineer or the installer is responsible for producing ade quate support Supporting structure for one piece weather proof louvres top flange Supporting structure for multi part weather proof louvres bottom flange W...

Страница 6: ... the frame Make absolutely certain that the flanges are fully seated along the entire periphery when the louvre is installed On weather proof louvres which have air duct connection nozzles and or internal water drain pipes the nozzles or pipes must have a torsion free connection The weath er proof louvres are then fully functional ATEX Compliance is mandatory with all relevant interna tional and n...

Страница 7: ... Installation in warm roof construction Substructure customer Vapour barrier customer W x H 50 min 120 Heat insulation customer Protective layer customer Seal customer 30 W x H clearance mounting frame weather poof louvre clearance Frame optional delivery LUCOMA standard height 440mm Heat insulation customer standard thickness 80mm Drainage Mounting bracket LUCOMA supply 150 150 Flange Flange ...

Страница 8: ...ver roof Substructure customer Vapour barrier customer W x H 50 min 120 Heat insulation customer Protective layer customer Seal customer 30 W x H clearance mounting frame Frame optional LUCOMA supply standard height 440mm Heat insulation customer standard thickness 80mm Venting duct customer Mounting bracket LUCOMA supply 150 150 Drainage Flange Flange weather poof louvre clearance ...

Страница 9: ...nage by pipes Substructure customer Vapour barrier customer W x H 50 min 120 Heat insulation customer Protective layer customer Seal customer 30 W x H clearance mounting frame weather poof louvre clearance Heat insulation customer standard thickness 80mm Mounting bracket LUCOMA supply Drainage pipe customer Frame optional delivery LUCOMA standard height 440mm 150 150 Flange Flange ...

Страница 10: ... 30 Heat insulation customer standard thickness 80mm Drainage pipe customer B x H B x H weather poof louvre clearance Frame optional delivery LUCOMA standard height 440mm 150 225 Flange Flange 90 75 clearance mounting frame Substructure customer Seal customer Venting duct customer Mounting bracket LUCOMA supply Heat insulation customer Protective layer customer Water film rupturing permeable layer...

Страница 11: ...ted roof construction wet side insulation Protective layer customer Seal customer Water film rupturing permeable layer customer W x H 50 min 120 30 W x H 150 150 Drainage Flange Flange weather poof louvre clearance Mounting bracket LUCOMA supply Heat insulation customer Heat insulation customer standard thickness 80mm Frame optional delivery LUCOMA standard height 440mm clearance mounting frame Su...

Страница 12: ... H 50 min 120 30 W x H 150 150 Drainage Flange Flange weather poof louvre clearance Protective layer customer Seal customer Water film rupturing permeable layer customer Mounting bracket LUCOMA supply Heat insulation customer clearance mounting frame Heat insulation customer standard thickness 80mm Frame optional delivery LUCOMA standard height 440mm Substructure customer Venting duct customer ...

Страница 13: ...pes W x H 50 min 120 30 W x H 150 150 Protective layer customer Seal customer Water film rupturing permeable layer customer Mounting bracket LUCOMA supply Heat insulation customer Substructure customer weather poof louvre clearance Flange Flange Heat insulation customer standard thickness 80mm Frame optional delivery LUCOMA standard height 440mm Drainage pipe customer clearance mounting frame ...

Страница 14: ...in 120 30 B x H 150 225 90 75 Protective layer customer Water film rupturing permeable layer customer Mounting bracket LUCOMA supply Heat insulation customer Seal customer Substructure customer Venting duct customer Frame optional delivery LUCOMA standard height 440mm Drainage pipe customer clearance mounting frame weather poof louvre clearance Flange Flange Heat insulation customer standard thick...

Страница 15: ...tch cabinets gear units etc and for their transport In appli cation of multilegged slings the rules e g according to DIN EN 818 4 must be observed Ring screws should be checked for firm seat and any ob vious damages corrosion deformation before use Ring screws with deformations should not continue to be used and should not be screwed back in Any subsequent colour marking applied on the ring screws...

Страница 16: ...ction examples are published based on conventional flat roof structures The specifications contained in this document were com piled to the best of our knowledge based on current knowledge and experience LUCOMA reserves the right to make changes at any time to match the current state of production practice These planning documents make no claim to completeness No legally binding obligation can the...

Отзывы: