Lucent CDMA 3G 1xEV
Powered by Bell Labs™
EXHIBIT 4: Installation Manual
The Installation manual is provided.
Applicant: Lucent Technologies
FCC ID: AS5ONEBTS-11
Page 1 of 1
Страница 1: ...Lucent CDMA 3G 1xEV Powered by Bell Labs EXHIBIT 4 Installation Manual The Installation manual is provided Applicant Lucent Technologies FCC ID AS5ONEBTS 11 Page 1 of 1 ...
Страница 2: ...ary This document contains proprietary information of Lucent Technologies and is not to be disclosed or used except in accordance with applicable agreements Copyright 2006 Lucent Technologies Unpublished and Not for Publication All Rights Reserved 401 703 454 FOA Draft Issue 1 February 2006 ...
Страница 3: ...or this IP is 401 703 414 To order this IP use one of the following numbers to call the Lucent Technologies Customer Information Center in Indianapolis Indiana Within the United States 1 888 LUCENT8 1 888 582 3688 fax 1 800 566 9568 From Canada 1 317 322 6615 fax 1 317 322 6699 From all other countries 1 317 322 6416 fax 1 317 322 6699 Technical Support For technical support see To obtain document...
Страница 4: ...l installation process table xxii Installation Procedure checklists xxiii General information 1 3 Modular Cell 4 0B cabinets 1 2 Torque requirements 1 29 Tools supplies and parts required master list 1 31 Safety precautions 1 34 Safety General precautions for installation procedures 1 35 Safety Specific hazards 1 37 Safety labels 1 40 Product safety 1 41 FCC statements 1 42 Canadian standards 1 45...
Страница 5: ... 3 Connection of the conduit with T1 E1 lines and external user alarms cables to a 4 0B primary cabinet 3 13 How to route the T1 E1 cable s to a Modular Cell 4 0B dual band cabinet in a line up that has a Modular Cell 3 0 4 0 or 4 0B primary cabinet with integrated power 3 16 How to route the T1 E1 cable s to a Modular Cell 4 0B dual band cabinet in a line up that has a Modular Cell 1 0 2 0 3 0 4 ...
Страница 6: ...y or dual band cabinet 4 6 How to make the cable connections between the first WNG battery cabinet and the 4 0B primary cabinet 4 14 How to make the cable connections between the second WNG battery cabinet and the first WNG battery cabinet 4 44 How to install 60ECv2 battery cabinets with a 4 0B primary cabinet with integrated power reference 4 71 How to install components in Modular Cell 4 0B cabi...
Страница 7: ...ietary Use pursuant to company instructions Appendix A EZBFo battery frame installation with Modular Cell 4 0B cabinets with integrated power AppendiixB Non Lucent power ancillary hardware installation cable routing and connection Appendix C Post installation checklists by cabinet Glossary ...
Страница 8: ... dual band cabinets with integrated power with various Legacy cabinets Modular Cell 4 0B outdoor cabinets without integrated power that utilize customer power For 4 0B Dual Band cabinet installation a PCS 4 0B dual band cabinet may be installed with an 850 Cellular 4 0B primary cabinet A PCS 4 0B dual band cabinet may be installed with an 850 Cellular 4 0B primary cabinet Also a 4 0B PCS dual band...
Страница 9: ...oor Site Preparation Guidelines 401 703 413 Important The procedures contained in this IP are based on Lucent Technologies standard practices Prior to beginning a Modular Cell 4 0B cabinet or battery cabinet installation installers should be familiar with these practices If there is a conflict standard practices take precedence However this IP takes precedence for identification of parts and mater...
Страница 10: ...rimary G1 and G2 Legacy cabinets 4 0B PCS cabinet four to six sectors added Increase in PCS carriers available in a 4 0B dual band cabinet to eleven total Addition of installation instructions for the dual band integrated power alarm cable 4 0B Heat exchanger and solar shield table revised RF cable routing and connection added between a 4 0B PCS Dual Band G 2 or G 3 cabinet and existing Legacy cab...
Страница 11: ...able routing and connection added between a 4 0B PCS Dual Band G 2 or G 3 cabinets and existing Legacy cabinets Refer to Routing and connection of RF inter frame cables to a 4 0B Modular Cell dual band cabinet on Page 6 8 In Appendix A EZBFo footprint figure with Modular Cell 4 0B cabinets added Refer to EZBFo battery frame footprint with Modular Cell 4 0B primary and dual band cabinets on Page A ...
Страница 12: ...zard is not avoided WARNING WARNING indicates the presence of a hazard that can cause death or severe personal injury if the hazard is not avoided CAUTION CAUTION indicates the presence of a hazard that will cause minor personal injury or property damage to include loss of software or interruption of service if the hazard is not avoided Within this IP the safety label typically includes additional...
Страница 13: ...procedures by chapter along with corresponding chapter and page references where the actual instructions can be found The procedures required for a certain installation are separated by headings which identify the installation activity This checklist may also be used by installers to record completion of individual installation activities The checklist contains a completed column and is printed on...
Страница 14: ...r order For the installation of primary cabinets use the following chapters and appendices as applicable Primary 4 0B cabinet with integrated power Initial installation Installation Process as a guide to installation steps Chapters 2 through 5 as applicable and Chapter 7 to finish the installation Primary 4 0B cabinet without integrated power Initial installation Installation Process as a guide to...
Страница 15: ...nets use the following chapters and appendices as applicable EZBFo battery frame installation first and or second with a Modular Cell 4 0B primary or dual band cabinet which has integrated power Installation Process as a guide to installation steps Chapter 2 for handling placement anchoring and grounding Appendix A for installation instructions Subjects covered in this manual are listed below Inst...
Страница 16: ...es the following procedures for power and power alarm connections Customer power references to other chapters and appendices as well as other documents AC Utility connection to the primary or dual band cabinet AC DC alarm and fan power cable connections between the first battery cabinet and the primary Modular Cell 4 0B cabinet as well as between the second battery cabinet and the first battery ca...
Страница 17: ...r dual band cabinets Final connection of primary cabinet batteries Replacement of panels and closure of cabinet doors all cabinets Appendix A EZBFo Battery Frame Installation with Modular Cell 4 0B cabinets with integrated power provides installation procedures for the installation of the EZBFo battery frame as an alternate to the WNG24 BC procedures presented in Chapters 4 and 5 Appendix B Non Lu...
Страница 18: ...eters with inches in parenthesis As an example 680 0 26 77 equals 680 millimeters or 26 77 inches Naming conventions The Flexent Modular Cell 4 0B cabinet will be referred to as the Modular Cell 4 0B cabinet or merely the 4 0B cabinet Standard cross sections and wire diameters of round copper conductors The following table is from IEC standard 60947 1 c IEC 1996 A1 1997 A2 1998 ISO CROSS SECTION m...
Страница 19: ...Protection Guidelines for Lucent Technologies Network Wireless System Cell Sites 401 200 115 Base Station CDMA Reference Frequency Timing Generator and GPS Antenna System Description Operation Installation and Maintenance 401 660 128 Lucent Technologies Installation Engineering Handbook 238 12IR125 Series II Batteries KS 23997 Product Manual Select Code 157 622 025 Corner Mounted Rotating Derrick ...
Страница 20: ...list sheets have been provided in Appendix A of the site preparation document see Related documentation to aid customers and Lucent personnel during a base station site Method of Procedure MOP walk through prior to the equipment installation A general list is provided in Chapter 1 Utilization of the checklists helps ensure a quality installation and provides a base station site history file for la...
Страница 21: ...3 1692 4579 How to comment Lucent Technologies makes every effort to ensure that all Flexent AUTOPLEX wireless documentation and training products meet your needs Lucent actively seeks feedback comments and suggestions from customers to improve the quality and usability of documentation and training You may submit feedback about Flexent AUTOPLEX wireless networks documentation and training via the...
Страница 22: ...nologies Learning Organization Attention Order Entry Section 2855 N Franklin Road P O Box 19901 Indianapolis IN 46219 USA To order by phone please contact the Lucent Technologies Customer Information Center CIC at the following numbers Within the United States Telephone 1 888 LUCENT8 1 888 582 3688 Facsimile 1 800 566 9568 From Canada Telephone 1 317 322 6615 Facsimile 1 317 322 6699 From all othe...
Страница 23: ...x x Lucent Technologies Proprietary See notice on first page 401 703 454 FOA Draft Issue 1 January 2006 ...
Страница 24: ...cess Overview Purpose This section provides an outline for the physical installation process as well as installation procedure checklists to guide the installer through specific installation procedures Physical installation process chart xxii Physical installation process table xxii Installation Procedure checklists xxiii ...
Страница 25: ...NUMBER 1 2 3 4 6 7 8 9 10 11 12 INSTALLER 2 ACTIVITY NUMBER 2 5 7 5 CON T ACTIVITIES INSTALLER ACTIVITY ASSIGNMENT INSTALLER 1 INSTALLER 2 1 Check parts inventory X 2 Line up cabinet on the cabinet anchor holes X X 3 Anchor the cabinet to the surface X 4 Ground the cabinet X 5 Install six RF antenna cable jumpers and one GPS antenna cable X 6 Install the conduit interface for the T1 E1 and user al...
Страница 26: ...nstallation manual itself The page references can be used in the event that a particular activity requires review This section contains installation checklists for the following chapters Chapter 2 Modular Cell 4 0B and WNG24 BC cabinet handling placement anchoring and grounding xxiv Chapter 3 Cable connections in the Modular Cell 4 0B cabinets xxvi Chapter 4 Power and power alarm connections in Mo...
Страница 27: ...STALLATION STEP PAGE Mark and drill the anchor holes 2 5 Set the 1 2 inch drop in anchor if applicable 2 7 PERFORM THE NEXT FIVE STEPS ONLY IF INSTALLING CABINETS ON MOUNTING BASES Set the 12 mm expansion stud anchors for mounting bases 2 9 Install the optional bases for the primary cabinet and battery cabinets if applicable using zone 0 1 and 2 type anchors 2 11 Install the optional mounting base...
Страница 28: ... through coupling and tighten the anchor bolts or nuts 2 48 PERFORM THE NEXT SEVEN STEPS ONLY IF INSTALLING A 4 0B DUAL BAND CABINET Prepare the previous Modular Cell cabinet for connection of a 4 0B dual band cabinet 2 51 Partially install the AC cable guide in the previous Modular Cell cabinet if applicable 2 53 Prepare the 4 0B dual band cabinet for connection to the previous Modular Cell cabin...
Страница 29: ...GPS antenna cable 3 11 PERFORM THE NEXT STEP TO INSTALL THE CONDUITS FOR TI E LINES AND EXTERNAL USER ALARMS Connect the conduit between the metal conduits and the antenna cable cover of the 4 0B primary cabinet 3 13 PERFORM THE NEXT STEP IF INSTALLING A DUAL BAND CABINET IN AN INTEGRATED POWER LINE UP Route T1 E1 cables to the Modular Cell 4 0B dual band cabinet 3 16 PERFORM THE NEXT STEP IF INST...
Страница 30: ...AVE A MAXIMUM OF 20 T1 E1 LINES Punch down T1 E1 lines on the EFIM in Modular Cell 4 0B cabinets that accept a maximum of twenty T1 E1 lines 3 41 PERFORM THE NEXT STEP TO INSTALLING EXTERNAL USER ALARM CABLES WITH 4 0B CABINETS Punch down the external user alarms cables on the EFIM in Modular Cell 4 0B cabinets 3 48 PERFORM THE NEXT STEP TO INSTALLING THE DUAL BAND CABINET INTEGRATED POWER ALARM C...
Страница 31: ...RATED POWER Prepare the AC power module ACPDA for connection of the AC utility wires 4 7 Install a 2 inch flexible conduit fitting on the primary or dual band cabinet 4 9 Connect the flexible conduit between the existing metal conduit and the fitting at the primary or dual band cabinet 4 10 Route and connect the AC utility wires in the primary or dual band cabinet 4 12 PERFORM THE NEXT THIRTEEN ST...
Страница 32: ...repare the first and second battery cabinets for connection of the DC cables 4 48 Connect the DC cables in the second battery cabinet 4 50 Connect the battery cabinet cables in the first battery cabinet 4 52 Identify and place the alarm and fan power alarm cables between the two battery cabinets 4 54 Route and connect the fan power alarm cable in the second WNG24 BC battery cabinet 4 56 Route and ...
Страница 33: ...__________________________ WNG24 BC Battery Cabinet Serial Number _______________________________ Table 4 Chapter 5 COMPLETED INSTALLATION STEP PAGE PERFORM THE NEXT TWO STEPS IF MOVING OR INSTALLING A RECTIFIER OR BATTERIES IN A MODULAR CELL 4 0B CABINET Install rectifiers in a Modular Cell 4 0B primary cabinet 5 3 Install batteries in a Modular Cell 4 0B cabinet 5 5 PERFORM THE NEXT SEVEN STEPS ...
Страница 34: ...ATTERIES IN A BATTERY CABINET THAT HAS TYPE 2 SHELVES NO SPACING RODS Prepare the 12IR125 batteries for installation 5 49 Place the 12IR125 batteries on a shelf 5 52 Adjust and secure the front battery retaining brackets 5 55 Connect positive battery cables to all battery strings 5 57 Attach interconnecting bus bars to all battery strings 5 59 Connect the negative battery cables to all battery str...
Страница 35: ...in the battery cabinet 5 82 PERFORM THE NEXT THREE STEPS WHEN MAKING THE FINAL CABLE CONNECTIONS OF A FIRST OR SECOND BATTERY CABINET AS APPLICABLE Connect the first battery cabinet 24 VDC cables at the HPDA in the Modular Cell 4 0B primary cabinet 5 85 Connect the DC return cables from the battery cabinet to the return bus in the primary cabinet 5 87 Connect the battery cables in the first and or...
Страница 36: ...up Modular Cell 4 0B Dual Band Cabinet Serial Number _______________________________ Table 5 Chapter 6 COMPLETED INSTALLATION PROCEDURE PAGE PERFORM THE NEXT THREE PROCEDURES BEFORE STARTING THE INSTALLATION OF CABLES BETWEEN MODULAR CELL CABINETS Read cabinet definitions 6 3 Identify your line up configuration 6 4 Determine the prerequisite changes needed in the existing cabinet s in your line up...
Страница 37: ... NEXT THREE STEPS TO VERIFY ANTENNA STATUS AND REFERENCE POWER UP AND SYSTEM TESTS Verify GPS antenna connection 7 3 Verify RF antennas not connected 7 3 Perform power up and system test 7 4 PERFORM THE NEXT FIVE STEPS IF INSTALLING A 4 0B PRIMARY OR DUAL BAND CABINET Test and connect the internal battery cables if applicable 7 5 Connect the unterminated end of the RF antenna jumper cables to the ...
Страница 38: ...ULE OUTER FRAME AND MARK DRILL AND SET ANCHORS Place and attach a battery base module to the Modular Cell cabinet or the first battery base module using the applicable conduit A 10 Remove the top and filter panels from the battery base module A 14 Mark and drill the anchor holes A 16 Set the 1 2 inch diameter drop in anchor A 18 PERFORM THE NEXT FOUR STEPS TO INSTALL HEATER PADS IN THE BATTERY MOD...
Страница 39: ...ery base module A 45 PERFORM THE NEXT STEP TO ROUTE AND CONNECT THE AC CABLE IN THE FIRST BATTERY BASE MODULE Route and connect the AC cable from the Modular Cell cabinet to the AC block in the battery base module A 48 PERFORM THE NEXT FIVE STEPS TO ROUTE AND CONNECT THE SIGNAL CABLES IN THE FIRST BATTERY BASE MODULE Install the fuse the fuse alarm actuator and the fuse alarm switch in the first b...
Страница 40: ... outer frame over the inner frame and attach the internal ground cables A 82 Attach the internal ground cable between the add on module and the module below it A 83 PERFORM THE NEXT STEP TO ROUTE AND CONNECT THE AC CABLE FROM AN ADD ON BATTERY MODULE TO THE MODULE BELOW IT Route and connect the AC cable from the add on module to the next lower module A 84 PERFORM THE NEXT TWO STEPS TO INSTALL THE ...
Страница 41: ...NECT THE DC CABLES FROM THE FIRST TO THE SECOND BATTERY BASE MODULE Route and connect the four DC cables between the first and second battery base modules A 119 PERFORM THE NEXT THREE STEPS TO INSTALL L1 BATTERIES IN A BATTERY MODULE Place batteries on a shelf A 128 Connect the battery cables to all batteries A 130 Attach interconnecting bus bars to all battery strings A 132 PERFORM THE NEXT THREE...
Страница 42: ...pplicable A 153 PERFORM THE NEXT TWO STEPS TO COMPLETE INSTALLATION OF 12IR125 BATTERIES IN A BATTERY MODULE Test and connect the 12IR125 battery cables to the bus bars in the battery modules A 157 Complete the installation of 12IR125 batteries A 160 PERFORM THE TWO STEP TO COMPLETE THE INSTALLATION OF BATTERY MODULES Replace the battery module panels and close secure the front door s if applicabl...
Страница 43: ...icable B 11 Attach the non Lucent power source to the cable duct assembly using conduits B 14 PERFORM THE NEXT TWO STEPS TO ROUTE AND CONNECT THE DC CABLES BETWEEN THE NON LUCENT POWER SOURCE AND THE MODULAR CELL 4 0B PRIMARY CABINET Route the DC cables from the Modular Cell 4 0B primary cabinet to the non Lucent power source B 22 Connect the DC cables at the Modular Cell 4 0B primary cabinet B 24...
Страница 44: ...nnected directly to the cable duct B 52 Install a 2 1 2 inch conduit if the power source is not connected directly to the cable duct B 53 Route the DC cables from the dual band cabinet to the non Lucent power source B 59 Connect the DC cables at Modular Cell 4 0B dual band cabinet B 62 PERFORM THE NEXT TWO STEPS TO ROUTE AND CONNECT THE AC CABLE S BETWEEN THE NON LUCENT POWER SOURCE AND THE MODULA...
Страница 45: ... Lucent Technologies Proprietary See notice on first page x l i i 401 703 454 FOA Draft Issue 1 January 2006 ...
Страница 46: ...ion 1 3 Modular Cell 4 0B cabinets 1 2 Torque requirements 1 29 Tools supplies and parts required master list 1 31 Safety precautions 1 34 Safety General precautions for installation procedures 1 35 Safety Specific hazards 1 37 Safety labels 1 40 Product safety 1 41 FCC statements 1 42 Canadian standards 1 45 Eco environmental statements 1 46 Packaging collection and recycling 1 48 Minimum install...
Страница 47: ...w Purpose This chapter provides an overview of Flexent Modular Cell site cabinet installation Descriptions of cabinets system configurations and typical installation sites are provided Tools supplies and required parts are listed and safety issues are addressed General information 1 3 Components of the Flexent Modular Cell 4 0B site 1 6 Outdoor Flexent Modular Cell 4 0B site descriptions typical 1...
Страница 48: ...s a stand alone primary cell or be configured as a growth dual band or mixed dual band cabinet at an existing Modular Cell site Note that the dual band and mixed dual band cabinets are available in specific line ups only Refer to Outdoor Flexent Modular Cell 4 0B site descriptions typical on Page 1 15 The Flexent Modular Cell 4 0B is a CDMA application product that utilizes the OneBTS digital modu...
Страница 49: ... T1 E1 facilities must be installed at demarcation point as described in Chapter 8 of the site preparation guidelines Balun Protector Box must be installed if required User alarm must be installed at demarcation point Grounding system must be installed RF and GPS antenna runs must be installed Surge protection for antennas must be installed Cable support must be installed Tower light power must be...
Страница 50: ...et A Modular Cell 4 0B primary cabinet is the cabinet that houses the CDMA radio communication electronics amplifiers and filters This cabinet contains all of the cell site control electronics alarms and T1 E1 facilities interface as well as the user alarm interface If the cabinet has integrated power it also contains a power supply rectifiers and up to four backup batteries two strings Dual Band ...
Страница 51: ... Cell 4 0B Additional information about each component is provided at the beginning of the associated installation chapters Modular Cell cabinet front view The figure below shows the front of the Modular Cell 4 0B cabinet Note that the key must remain in the latch to open the door Solar shield and heat exchanger applications may differ Refer to Heat exchanger and solar shield configurations for Mo...
Страница 52: ...binet with a sound muffler and rear heat exchanger Refer to the figure on Page 1 26 for a side view of the cabinet showing the rear heat exchanger and muffler profiles FOR SOLAR SHIELD APPLICATION BY CABINET CONFIGURATION REFER TO THE SOLAR SHIELD TABLE IN CHAPTER 2 Heat exchanger and solar shield configurations for Modular Cell 4 0B cabinets on Page 2 69 SOLAR SHIELD INSTALLATION INSTRUCTIONS IF ...
Страница 53: ...mplifiers alarms T1 E1 facilities interface and filters except in growth cabinets as well as the user alarm interface Integrated power cabinets also house a power supply rectifiers and up to four backup batteries two strings The Modular Cell 4 0B cabinet can be shipped with components which provide from 1 to 8 cellular or 1 to 11 PCS carriers maximum and 1 to 3 sectors maximum Upgrade kits are ava...
Страница 54: ...installation 1 9 Lucent Technologies Proprietary See notice on first page 401 703 454 FOA Draft Issue 1 January 2006 MODULAR CELL 4 0B ONE TO TWELVE AMPLIFIER CABINET WITH INTEGRATED POWER 3 CARRIER 4 to 6 SECTOR Note 1 Six PCS filters are illustrated ...
Страница 55: ...es Proprietary See notice on first page 401 703 454 FOA Draft Issue 1 January 2006 Overview of the Flexent Modular Cell 4 0B cabinet installation MODULAR CELL 4 0B THIRTEEN TO EIGHTEEN AMPLIFIER CABINET WITH INTEGRATED POWER ...
Страница 56: ...of the Flexent Modular Cell 4 0B cabinet installation 1 1 1 Lucent Technologies Proprietary See notice on first page 401 703 454 FOA Draft Issue 1 January 2006 MODULAR CELL 4 0B CABINET WITHOUT INTEGRATED POWER ...
Страница 57: ...ired to attach it to the first cabinet It also provides additional backup batteries up to 10 strings 20 batteries of type 12IR125 or L1 with type 1 battery shelves or 5 strings 30 batteries of type C 11 to supplement the batteries in the primary cabinet or the WNG24 K power cabinet as applicable First outdoor 60ECv2 battery cabinet for use with the PowerHouse 24 cabinet only The first optional 60E...
Страница 58: ...an integrated power 4 0B primary or dual band cabinet having more than 8 carriers The batteries are charged by the primary or dual band cabinet as applicable The optional EZBFo battery frame may also be used to provide additional backup batteries to supplement the batteries a 3GP24i power cabinet used with non integrated 4 0B primary or dual band cabinets The figure below illustrates one of two po...
Страница 59: ...4 0 cabinets that utilize a PowerHouse24 or WNG power cabinet the total load for all cabinets is limited to 21 kW for WNG DJ and to 17Kw for PowerHouse24 as well as WNG M and WNG K power cabinets The total number of carriers possible in the 4 0B dual band cabinet will not be limited by the use of the WHD DJ 21 kW power cabinet but will be limited by the 17 kW power cabinets PowerHouse24 WNG M and ...
Страница 60: ...ioned on a concrete pad on a rooftop Refer to Chapter 2 Heat exchanger and solar shield configurations for Modular Cell 4 0B cabinets on Page 2 69 for heat exchanger and solar shield applications for the following configuration 4 0B primary cabinet configuration with integrated power 1 3 PCS CARRIERS 1 11 PCS CARRIERS or 4 TO 6 SECTOR 1 8 850 CARRIERS P B POWER BATTERY FRONT HEAT EXCHANGER OPTIONA...
Страница 61: ...the following configuration 4 0B primary cabinet configuration without integrated power using customer supplied power and battery Refer to Chapter 2 Heat exchanger and solar shield configurations for Modular Cell 4 0B cabinets on Page 2 69 for heat exchanger and solar shield applications for the following configurations 1 3 PCS CARRIERS 1 11 PCS CARRIERS or 4 TO 6 SECTOR 1 8 850 CARRIERS AS APPLIC...
Страница 62: ...nets on Page 2 69 for heat exchanger and solar shield applications for the following configurations P 1 8 C 4 0B 1 8 CELLULAR 850 CARRIERS and 1 11 PCS P 1 11 C 4 0B PCS 850 Dual Band P 1 8 C 4 0B 1 11 PCS P 1 11 C 4 0B PCS 850 Dual Band CARRIERS CARRIERS and 1 8 CELLULAR CARRIERS P B POWER BATTERY FRONT HEAT OPTIONAL B B EXCHANGER EZBFo EZBFo BATTERY BATTERY FRAME FRAME 2 1 EZBFo EZBFo BATTERY BA...
Страница 63: ...changer and solar shield configurations for Modular Cell 4 0B cabinets on Page 2 69 for heat exchanger and solar shield applications for the following configurations 1 8 C 4 0B 1 8 CELLULAR 850 CARRIERS and 1 11 PCS 1 11 C 4 0B PCS 850 Dual Band 1 8 C 4 0B 1 11 PCS 1 11 C 4 0B PCS 850 Dual Band CARRIERS CARRIERS and 1 8 CELLULAR CARRIERS FRONT OR REAR HEAT OPTIONAL EXCHANGER AS APPLICABLE Future o...
Страница 64: ... PCS CARRIERS 7 8 850 CARRIERS in G 1 with 6C Primary FRAME 1 3 C 3 0 850 P B 1 3C 3 0 850 P B EZBFo BATTERY 1 and 2 P B 1 11 C 4 0B PCS 1 11 PCS CARRIERS 8 850 CARRIERS G 1 3 0 Primary 4 0B Dual Band FRAME P B 1 2C 4 0 850 4 0B Dual Band AND 4 0 G 2 1 4 C 4 0 850 P B 1 4 C 4 0 850 P B EZBFo BATTERY 1 and 2 P B 1 11 C 4 0B PCS 1 11 PCS CARRIERS 5 8 850 CARRIERS in G 1 with 4C Primary FRAME 4 0B Du...
Страница 65: ...S CARRIERS 1 11 PCS CARRIERS 5 8 850 CARRIERS 5 8 850 CARRIERS 4 0 Primary and G 1 4 0 Primary and G 1 FRAME 4 0B Dual Band 4 0B Dual Band 850 cabinets have batteries PCS cabinets above 8 carriers will not have batteries because of the presence of the A6 amplifier shelf The total output of the WNG M and WNG K power cabinets is 17 kW which limits the total number of carriers in the dual band cabine...
Страница 66: ...y and G 1 4 0 Primary and G 1 FRAME 4 0B Dual Band 4 0B Dual Band 850 cabinets have batteries PCS cabinets above 8 carriers will not have batteries because of the presence of the A6 amplifier shelf The total output of the WNG M and WNG K power cabinets is 17 kW which limits the total number of carriers in the dual band cabinet Use of an integrated power cabinet is recommended for the line ups show...