
CellPipe IAD 4A
Checking the activity of CellPipe IAD 4A status lights
CellPipe IAD 4A and CellPipe IAD 8T Hardware Installation Guide
7
When all the cables are connected, verify that the following status light behavior
takes place:
•
The
pwr
light is on initially and remains on. If not on, make sure the power
supply is properly connected.
•
The
act
light blinks during any LAN traffic. Otherwise, it remains off.
•
The
lnk
light is on if an Ethernet connection is established. If not on, check to
make sure your Ethernet cable is properly connected.
•
The
wan
light blinks until a DSL connection is established, and then it remains
on.
•
The
con
light is on only during the CellPipe IAD unit self-test and blinks when a
voice port is offhook.