Lucent Technologies Lineage
®
2000 50A -48V 364A-3 SR Series Rectifier
Issue 6 January 1997
Installation 5 - 5
4. Secure each line feed to the RSA using the applicable type
fitting, in accordance with local code. Recommended
fittings are provided in Figure 5-2.
5. Strip the outer jacket of the cable to expose a sufficient
length of the individual conductors (3) to allow for
non-jacketed runs inside the RSA.
6. At each RSA slot location terminal block, proceed
according to Figure 5-2 as follows:
a. Crimp and connect each ac input feed ground lead to
RSA ground terminals on bottom of the RSA.
b. Crimp and connect each ac input feed line lead to RSA
line terminals on terminal blocks.
7. Replace RSA rectifier slot covers.
Post-Installation
Instructions
Refer to Figure 5-1 and proceed as follows:
1. At plant ac distribution box/panel, close circuit breakers or
install fuses which supply ac power to each RSA rectifier
slot location.
2. Use a DMM to check for presence of 208/220/240 volts ac
at each RSA ac connector.
Adding a
Rectifier
The procedures for installation of a rectifier in an operating plant
or a new plant are identical.
1. Set POWER switch on rectifier to be installed to STBY
position (See Figure 6-1).
2. Set DC OUT circuit breaker on rectifier to be installed to
OFF.
Warning
Use the correct crimping tool and die for the conductors. See
Figure 5-2 for necessary tool.