![LUCCI GRENADA Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/lucci/grenada-series/grenada-series_installation-operation-maintenance-and-warranty-information_1945742008.webp)
Installation Instructions
7 |
P a g e
INSTALLATION INSTRUCTIONS
– INSTALLING THE FAN
1. The ceiling fan must be installed in a location so that the blades are at least 2.1 meters above the floor, and
300mm spacing from the tip of the blade to the nearest object or wall.
2. Secure the hanging bracket to the ceiling joist or structure that is capable of carrying a load of at least 30kg, with
two long screws provided. Ensure at least 30mm of the screw is threaded into the support. Fig 5
3. Carefully lift the fan and seat the down rod ball joint assembly into the spacing allocated in the mounting bracket
and lock the ball into place.
4. Refer to the wiring diagram provided for electrical connection/installation.
Fig. 6 & 7
WARNING: To prevent electrical shock or risk of fire, do not attempt to perform the electrical
connection wiring yourself. All electrical connections must be carried out by a licensed electrician.
NOTE: An additional all pole disconnection switch must be included in the fixed wiring.
5. After completing the electrical wiring at the mounting bracket terminal and connecting the fan motor and fixed
wiring via the quick connector, cover the mounting bracket with the canopy cover. Ensure all electrical wirings are
tucked inside the canopy cover and that they are not damaged during this step, and secure with screws.
NOTE: Ensure the mains power supplies are switched OFF during installation.
NOTE: The bracket screw provided is for use with wooden structures only. For structures other than
wood, the appropriate screw type MUST be used.
Tools required
Phillips head screwdriver
Flat head screwdriver
Pair of pliers
Step ladder
Wire cutter
Wiring, supply cable as required by
AS/NZS 3000 wiring code