background image

30366474EN-03

5

Alfa LU-VE is a trademark registered and owned by LU-VE Group. 

Alfa LU-VE reserves the right to change specifications without prior notification. 

6

4

7

3

10

11

5

6
8

1

2

9

 9

 9

 9

10

11

1. Centre of gravity

Forklifts can be used to lift 2 to 5 modules units 

only: always place the forks under the center of 

gravity.

2. Handle with care

When handling the unit, always take maximum 

care.

HANDLE

WITH CARE

WITH

HANDLE

CARE

2.4  Code description

VDD SE 90 4 .1 B D 72

SK C4

* - AL 2.1 CU *

1

2

3 4 5

6

7

8

9

10

11

12 13 14 15

 1 

Alfa-V dry cooler (VDD=standard Cu tube,VDD6=5/8" Cu, VDDY=5/8" SS304) 

 2 

Sound level/fan code (T=turbo, S=standard, L=low, Q=quiet, R=residential, E=EC fan motor) 

 3 

Fan diameter (80=800, 90=910, 100=1000 mm) 

 4 

Number of fan pairs (2 to 9)

 5 

Alfa-V series II

 6 

Tube rows code (A, B, C, D)

 7 

Fan motor connection (D=delta, Y=star)

 8 

No of circuits

 9 

Packing (SK=container skid)

10 

Case material

11 

Electrical options 

12 

Fin material (AL=aluminium, IF=industrial fins, SWR=AlMg, EP=epoxy coated aluminium,    

 

FC=F-coat, RIF=industrial R-fin, REP=epoxy coated aluminium R-fin, RSWR=AlMg R-fin)

13 

Fin spacing (2.0, 2.1, 2.3, 2.5, 3.0 mm)

14 

Tube material (CU=copper, SS=stainless steel)

15 Options

3  Product labels

Содержание Alfa LU-VE Alfa-V VDD

Страница 1: ...ORIGINAL INSTRUCTIONS 30366474EN 03 Alfa V VDD Instruction manual Product description Product labels Transport lifting Installation Maintenance Spare parts...

Страница 2: ...ons 4 2 4 Code description 5 3 Product labels 5 4 Unpacking and lifting 4 1 Unit delivered by standard truck 8 4 2 Unit delivered in a container 8 4 3 Lifting from above 10 5 Installation 5 1 Containe...

Страница 3: ...tion until the conformity of the complete machine or cooling system has been declared according to the following standards and directives Pressure Equipment Directive 2014 68 EU Machine Directive 2006...

Страница 4: ...tection class IP54 according to DIN 40050 and integrated thermo contacts to provide reli able protection against thermal overload AC power supplies 400 50 3 400 60 3 and 460 60 3 EC power supply 380 4...

Страница 5: ...5 6 7 8 9 10 11 12 13 14 15 1 Alfa V dry cooler VDD standard Cu tube VDD6 5 8 Cu VDDY 5 8 SS304 2 Sound level fan code T turbo S standard L low Q quiet R residential E EC fan motor 3 Fan diameter 80 8...

Страница 6: ...g 5 Sn Motorfan data Vn 3 380 480V f 50 60Hz Country of origin Italy i E X A M P L E WARNING READ INSTRUCTION MANUAL BEFORE INSTALLATION AND MAINTENANCE TO AVOID INJURIES OR DAMAGE Manufacturer Manuf...

Страница 7: ...umber 8 Fan motor Fan motor item number 10 11 In Out Refrigerant connections inlet and outlet IN OUT Grounding Whenever electrical components supplied by Alfa LU VE have this sticker is mandatory to g...

Страница 8: ...or in containers 4 1 Unit delivered by standard truck The procedure below applies to the unloading of units delivered on standard trucks 2 5 fan pairs unit can be unloaded from the side of the truck w...

Страница 9: ...st 1 m The space between the unit and the roof of the container is reduced Contact with the roof can cause damage to the unit A B With a second forklift identified by letter B insert the forks under t...

Страница 10: ...g lugs to the crane hoisting beam following the procedure described in para graph Lifting from above When the crane holds up the unit remove forklift A Slightly lift the unit and slowly drive forward...

Страница 11: ...ademark registered and owned by LU VE Group Alfa LU VE reserves the right to change specifications without prior notification 2 MOD 4 FANS 3 MOD 6 FANS 4 MOD 8 FANS 5 MOD 10 FANS 6 MOD 12 FANS 7 MOD 1...

Страница 12: ...ption is selected in order to facilitate loading and unloading operations 5 fan pair units container skids have two additional feet which can be recognized because above them there is no coil support...

Страница 13: ...nd or to a beam structure and for the installation of vibration dampers 5 4 Concrete mounting base To avoid oxidation of the equipment feet it is strongly recommended to mount the heat exchanger on co...

Страница 14: ...must be carried out before positioning the unit Vibration dampers are to be positioned between the unit feet and the mounting base with the supplied M16 screw Fan pairs Vibration dampers 2 4 3 4 4 6...

Страница 15: ...icient space is available for maintenance Verify the structures supporting capacity regarding the weight of the unit s including the liquid Floor mounted Single unit Two or more units The unit spacing...

Страница 16: ...ds When walls with different configuration or heights than the ones shown in the previous pictures are present When more than 6 units are installed on a single platform When severe environmental loads...

Страница 17: ...nnections Switch on fan power supply Start the fans and verify fan direction After some operating time check the absence of air in the liquid circuit vent if needed and verify that current absorbtion...

Страница 18: ...osition Remount fasteners Use an anti corrosion coating like Geomet or comparable when remounting using new fixing bolts Restore the electric connections water trap as shown Check for correct fan dire...

Страница 19: ...LU VE reserves the right to change specifications without prior notification 8 Spare parts Spare parts for Alfa V VDD Fan Switch on off Switchboard Vibration damper Protection grids available on reque...

Страница 20: ...alfa luvegroup com...

Отзывы: