background image

 

Fitting Instruction 

 

Article-No. : 

120B029 

Product : 

Super Bike Conversion Kit 

Model : 

BMW BMW K1200R  2005 – 2008 / K1300R  2009

 

Type : 

K12R / K12S 

 

Important:

 

 

Read this instruction manual carefully and mind all warnings and tips. You should do this work 
only if you‘re qualified; otherwise we recommend this mounting to be done by a professional 
workshop. Improperly mounting of this kit can reduce the driveability of the motorcycle and may be 
a risk to your health and life. 
 
Special works are marked with the following signs. Please take special care on these works. 

 

Warning!  Important mounting instruction. It shows risks to your life and health. 

 

 

 

Tips for mounting and maintenance or to avoid damage.

  

 

Mounting:  

 

 

To avert any damage from the electrical systems of your motorcycle, you should 

disconnect the battery ground while installing the Superbike conversion kit. 

Remove handlebar controls, clutch lever bracket and brake cylinder assy, then remove the 
original handlebar. 

Dismount the original top yoke and install the Superbike top yoke. To demount the ignition lock 
you need to drill out the heads of the breakaway bolts. Use the attached bushings (length 
12mm) in combination with the M8x25mm bolts as a steering stop. Use fluid bolt lock as 
Loctite 243 or 270. Fit the ignition lock with the attached bushings (length 23,5mm), new bolts 
(M8x45mm) and corrugated washers underneath the bolts heads at the LSL-yoke. You should 
drill out the hexagon sockets of the bolts as theft protection. To fix top yoke, tighten steering 
head up to the original torque that refers to the vehicle manufacturer’s instruction. 

————————————————    

Accessories from

  

 

  —   

The Original

    —— 

Rev. 00 22/10/2010 

Page 1 of 3 

 

Отзывы: