
Chapter 10 Program Example
10 - 29
Once N Configurator is executed, a new project window becomes active as follows:
[Figure 10.3.2] Initial Execution Screen: New Project Window
For network configuration, the master module (XGL-PMEB) should be composed first. Select
XGL-PMEB from the device list window on the left and drag and drop on the topology in the
project window as seen in the figure below.
[Figure 10.3.3] Insert Master module
Содержание XGL-PMEA
Страница 53: ...Chapter 6 SyCon Setting 6 4 5 Configuration Setup Select Next ...
Страница 55: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Страница 62: ...Chapter 6 SyCon Setting 6 13 3 Edit 4 Master Configuration Select Settings Master Configuration on menu ...
Страница 148: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Страница 176: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Страница 189: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...