35
•
Power-up starts if the solar cell voltage is >460 volts
Ö
“READY” status LED is lit, “ON” status LED flashes
•
Display:
Ö
On
Ö
UDC
Solar cell voltage in volts (V)
Ö
Activating
Ö
This process can take up to one hour if the device is commissioned; during normal
operation, it takes up to 3 minutes.
•
Feed
mode:
Ö
“On” status LED emits steady light, “Ready” status LED turns dark.
•
Display
Ö
PAC
Feed power in watts (W)
Ö
UAC
Line voltage in volts (V)
Ö
UDC
Solar cell voltage in volts (V)
Ö
E TAG
Yield of the day in kWh
•
Check
time:
o
If the electronic system has been disconnected from the supply voltage for a longer period
(approx. 2-3 weeks), incorrect time setting is possible. For this reason, it is necessary to
check and, if required, to reset the time as follows, before switching on:
o
Press F1 key to open menu.
o
Use
▼
arrow key to select “set time” menu item.
o
Use
▲▼
arrow keys for successive setting of day, month, year, hour, minute, and second.
o
Press key to confirm.
5.5 Navigation via the Operating Pad
Figure 16: Navigation display
Status LED
Содержание LSRP-T100LT
Страница 1: ...LSPV Solar Inverter User Manual LSRP T100LT T160LT ...
Страница 12: ...11 IP24 Housing Filter mat 1500 min 1000 max 200 Air duct Filter mat Filter mat ...
Страница 13: ...12 Abutting Installation REFUSOL REFUSOL Air duct Spaced Installation REFUSOL REFUSOL Air duct Air duct ...
Страница 21: ...20 4 2 Overview of the OPEN Control Cabinet Figure 10 Overview of the LSPV inverter connections ...