5.1 Preconditions
In order to commission the LSPV inverter properly and safely, the below requirements must be met.
Before connecting the power supply and PV generator, the following must be verified:
o
All connections were made according to the connection diagram.
o
The ground wire for the mains feed-in and auxiliary power supply must be connected.
o
The mains feed-in has a clockwise rotating field.
o
The correct polarity at the PV generator connection is verified.
o
An insulation test of the PV generator has verified there is no ground fault.
o
Check that all connection lines are firmly locked into place.
o
All necessary protective covers are in place.
5.2 Switching
On
1 Verify that the device is connected to line voltage. If not, insert the external power fuse
or turn on the circuit breaker.
2 Set the AC-power switch on the LSPV to the ON position.
Note:
The control panel is only active with activated auxiliary supply voltage.
The control panel, including its staus indicators, display and operator
keys, is only active with activated auxiliary supply voltage because
the electronics of the LSPV
inverters is exclusively supplied from the
auxiliary voltage.
5.3 Setting the Country Code and the Menu Language
The country code defines the country-specific grid monitoring parameters. The menu
language is automatically set when the country code is selected. Thereafter, the menu
language can be selected as desired at any time, independent of the country code set in the
menu. The country code is not set on delivery.
CAUTION
The selected country code can only be changed by Service personnel!
After having set and confirmed the country code, you cannot change it yourself
any longer.
This is also applicable to devices which are or were in operation. According to
a new rule, the country code can now only be changed by Service personnel.
Содержание LSRP-T100LT
Страница 1: ...LSPV Solar Inverter User Manual LSRP T100LT T160LT ...
Страница 12: ...11 IP24 Housing Filter mat 1500 min 1000 max 200 Air duct Filter mat Filter mat ...
Страница 13: ...12 Abutting Installation REFUSOL REFUSOL Air duct Spaced Installation REFUSOL REFUSOL Air duct Air duct ...
Страница 21: ...20 4 2 Overview of the OPEN Control Cabinet Figure 10 Overview of the LSPV inverter connections ...