7.5. Calibrating Boom Angle
7.5.1.
Calibrating a low boom angle
Safely luff the boom down to a low angle, eg. 30°,
Enter calibration mode and select the correct function code for calibrating low boom angle,
Accurately measure the actual boom angle using an angle finder,
Use the UP/DOWN keys to ramp the display to the required value then press ENTER to
accept this value.
7.5.2.
Calibrating a high boom angle
Safely luff the boom up to a high angle, eg. 65°,
Enter calibration mode and select the correct function code for calibrating high boom angle,
Accurately measure the actual boom angle using an angle finder,
Use the UP/DOWN keys to ramp the display to the required value then press ENTER to
accept this value.
Verify that the boom angle is accuratel y measured, using the VIE W
BOOM ANGLE function.
7.6. Calibrating Jib Angle (Luffing fly jibs only)
7.6.1.
Calibrating low Jib angle
Ensure that the angle sensor is mounted on the luffing fly and the cable is connected,
Safely luff the jib down to a low angle ( eg. 30° to the horizon ),
Enter calibration mode and select the correct function code for calibrating low jib angle,
Accurately measure the actual jib angle using an angle finder,
Use the UP/DOWN keys to ramp the display to the required value then press ENTER to
accept this value.
7.6.2.
Calibrating high Jib angle
Safely luff the jib up to a high angle ( eg 65° to the horizon ),
Enter calibration mode and select the correct function code for calibrating high jib angle,
Accurately measure the actual jib angle using an angle finder,
Use the UP/DOWN keys to ramp the display to the required value then press ENTER to
accept this value.
Verify that the jib angl e is accuratel y measured, using the VIEW JIB
ANGLE function.
Содержание RCI-1550 LM
Страница 2: ......
Страница 58: ...Drawings Part A System Components ...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ...APPROVED BY TOL 0 0 0 1 2 3 4 55 26 2 0 7 2 8 9 1 1 1 1 0 7 5 6 2 ...
Страница 64: ......
Страница 66: ...APPROVED BY TOL 0 0 0 1 22 3 4 5 6 0 22 2 1 7 8 98 1 7 8 98 7 8 98 7 8 98 1 0 9 8 3 6 8 3 ...
Страница 67: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 5 0 42 4 2 3617 8 9 8 8 2 ...
Страница 68: ... APPROVED BY 0 1 2 22 3 3 3 TOL 4 4 23 4 232 22 3 242 4 2 32 2 3516 7 8 7 7 9 2 3 42 4 2 ...
Страница 72: ......
Страница 74: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ...Drawings Part B General Arrangement and Wiring ...
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ... Appendix 4 RCI System Crane Configuration Sheet Duty Listing XQFWLRQ RGHV ...
Страница 97: ......