7
4. ASSEMBLY INSTRUCTIONS
A. Before assembling make sure that you will have enough space around the item.
B. Use the present tooling for assembling.
C. Before assembling please check whether all needed parts are available (at the above of this
instruction sheet you will find an explosion drawing with all single parts (marked with numbers)
which this item consists of.
STEP 1
STEP 2:
a) Attach the Front Stabilizer (pt.15) to the
Main Frame (pt.16) using two sets of Ø8
Flat Washers (pt.5), M8 Domed Nut (pt.6)
and M8*52 Carriage bolt (3).
b) Attach the Rear Stabilizer (pt.4) to the
Main Frame (pt.16) using two sets of Ø8
Flat Washers (pt.5), M8 Domed Nut (pt.6)
and M8*52 Carriage bolt (3).
a) First, the elastic bolt (7) of the large ball
head is loosened and pulled down, then
the cushion adjusting pipe assembly (10)
is inserted into the inner liner of the main
frame assembly (16) to make it in an
appropriate position, and then the elastic
bolt (7) of the large ball head is loosened
and locked.
b) At the same time, the buffer sliding tube
assembly (12) is inserted into the buffer
regulating tube assembly (10) and the
elastic bolt (7) of the large ball head is
locked by the buffer.
c) Finally, the buffer pad (13) is locked with a
tool (using a cross wrench).