18
BACKHOE INSTALLATION
4.
Install the right-hand Rear plate CP LH mount on the right-hand tractor frame & loader frame, secure with
M12x40L bolts(8), M12 spring washers(9) - (Torque to 94N.m(70lb ft)), M16x50L bolts(5), M16 spring washers(6),
M16 plain washers(14), M16L nuts(7). - (Torque to 234N.m(173lb ft)).
5.
Install the left-hand Frame CP LH mount on the left-hand tractor frame, secure with M12x55L bolts(10), M12
spring washers(9) - (Torque to 94N.m(70lb ft)), M14x55L bolts(11), M14 spring washers(12) - (Torque to
151N.m(111lb ft)), M16x40L bolts(13), M16 spring washers(6). - (Torque to 234N.m(173lb ft)).
6.
Connect strap to backhoe assembly and lift using hoist crane. And adjust the crane position to align the
mounting frame and backhoe assembly. And once the backhoe is positioned, assemble the Lock pin in the hole.
5, 6, 7, 14
8, 9
11, 12
13, 6
10, 9
Lock pin
Содержание 30139708
Страница 9: ...7 SAFETY DECALS 40358868 40417542 40417545 40417547 40417543 40717544 40358874 40358875...
Страница 10: ...8 SAFETY DECALS 40358876 40358812 40358878 40410884 40410879 40436070...
Страница 40: ...38 HYDRAULIC SYSTEM SCHEMATIC...
Страница 45: ...43 IMBH20 MAIN FRAME GROUP...
Страница 47: ...45 IMBH20 MAIN FRAME GROUP...
Страница 51: ...49 IMBH50 BUCKET DIPPERSTICK GROUP...
Страница 53: ...51 IMBH61 HYDRAULIC LINE GROUP...
Страница 55: ...53 IMBH62 HYDRAULIC CONTROL FITTING GROUP...
Страница 86: ...84 SERVICE MANUAL VALVE Measurement data...