Chapter 3 Installation and Test Operation
3-2
3.2
From Setting to Operation
The sequence of the product from installation to operation will be described below. After the product
installation is complete, install and configure the system to be operated as specified in the following
sequence.
Note
1) Station No. of master module is fixed as
‘0’.
2) Station No. of slave module has not to set by
‘0’
3) In case of using remote connection, parameter will be applied when remote connection is finished.
Operation Sequence
Install Rnet Master module.
Check the number of communication modules. (Max 2ea per main unit)
Configure the system with module.
Use Rnet cable specified, terminating resistor, communication power to configure the
system.
Set the station number of slave module.
With power (master and slave module) On, check the LED status of the communication
module.
Check if the interface of the communication module is normal (I/F: Flickering, Run: On)
with CPU.
Using XG5000
1) Execute [Read]
2)
“High-speed link”
3) Set the address of Read area/Save area for
slave module
4) [Online]
– [Write]
5) [Online]
–[Communication module setting]-
[Enable Link].
XG5000
1) [Online]-[Connection]
2) [Online]
– [Communication module setting] – [System
Diagnosis]
3) Select the Master module in System diagnosis window and Check the
system
’s operation status at “High-speed link” and “Auto scan” (It appeared by right button
click of selected area).
Start Run
Содержание XBL-RMEA
Страница 1: ...Programmable Logic Control XGB Rnet I F Module XGT Series XBL RMEA GOL RR8T ...
Страница 25: ...Chapter 4 System Configuration 4 2 4 1 3 Mixed configuration 2 between XBL RMEA repeater Rnet slave ...
Страница 45: ...Chapter 6 Communication Program 6 2 Configuration of system ...
Страница 67: ...Appendix A 13 A 3 External Dimensions 1 XBL RMEA Unit mm 2 GOL RR8T Unit mm ...