Operation
ProtoMat S
72
HB V0.9/Mrz-11
©
2011
LPKF AG
6
➨
The drilling spindle rotates and the dust extraction is activated.
5.
Click on [Lift head up/down ].
➨
The mill/drill head is lowered according to the milling depth setting.
6.
Click [+X], [-X], [+Y] or [-Y] until the final position is reached.
➨
Now the milling track is produced.
7.
Click on [Lift up/down head].
➨
The mill/drill head will be lift up.
8.
Click on [Motor on/off].
➨
The drilling spindle stops and the dust extraction will be deactivated.
9.
For further milling tracks you have to repeat the steps 3 to 8.
♦
Now the milling path is produced.
Содержание ProtoMat S103
Страница 1: ...LPKF ProtoMat S Manual Order Code 1000447...
Страница 2: ......
Страница 10: ...Content ProtoMat S 8 HB V0 9 Mrz 11 2011 LPKF AG ddd...
Страница 22: ...Product description ProtoMat S 20 HB V0 9 Mrz 11 2011 LPKF AG 1...
Страница 26: ...Safety notes ProtoMat S 24 HB V0 9 Mrz 11 2011 LPKF AG 2...
Страница 40: ...Functional description ProtoMat S 38 HB V0 9 Mrz 11 2011 LPKF AG 3...
Страница 42: ...Transport and storage ProtoMat S 40 HB V0 9 Mrz 11 2011 LPKF AG 4...
Страница 90: ...Troubleshooting ProtoMat S 88 HB V0 9 Mrz 11 2011 LPKF AG 7...