background image

I-20

of 20

P.O. BOX 3448 • OMAHA, NEBRASKA 68103-0448 • (800) 228-9882

0-3F 

REV. AL 

5954 

6/2007 

Lozier® Corporation 2007

11.

Install Base End Trims, Uprite 

End Trims and Top Rails.

Top Rails - Tabs on Top 

Rail must lock in place.

BET -  Slide over Base Bracket until 

 

Stop Tab on BET rests on top of

 

Base Bracket (see Detail below).

Hook top of Uprite End Trim 

over top of Uprite, then press 

on working toward floor.

12.

Install Base Decks and Shelves as shown. Be sure Base End Trim (BET) is installed before installing Base 

Decks (see Step ). Refer to 

Allowable Shelf Load Limits

 on page I-3 for shelf information.

To  install  Decks,  tilt 

upward  and  hook  rear 

molding behind deck hold 

down pin.

Deck Hold

Down Pin

Deck must sit on 

lock tab on BET

IMPORTANT

See Plan View of Base Bracket above 

for seating Base Bracket End Trim

1.

  Insert front flange into front  

of BB adjacent to the CBF

2.

  Put rear flange against 

BB hook slide shown

Plan View of

Base Bracket

BET must slide behind front and 

rear flanges on Base Bracket to 

be properly seated

IMPORTANT

Base Bracket End Trim (BET) 

must

 be installed 

before

 installing Base Decks.

Island Section Installation

NOTICE:

If Trim or Shelves do not fit properly, check to be sure unit is leveled properly. 

If the Uprites are not plumb and/or at proper height, redo Step 7, page I-8.

Отзывы: