P.O. BOX 3448 • OMAHA, NEBRASKA 68103-0448 • (800) 228-9882
I-7
of 20
0-3F
REV. AL
5954
6/2007
Lozier® Corporation 2007
5.
Install one Back now for stability. For two-piece Backs, install lower Back Panel only at this time. Refer to
Back
Panel Information
on page 4 for Back Panel Sizes.
Chalkline
Use care in lowering Back
into place.
DO NOT DROP!
NOTE:
Top of Pegboard Backs are marked with a
paint stripe. First row of holes are
7
/
8
” from
top edge.
TWO-PIECE BACK DETAIL
NOTE:
If ceiling height is not
adequate to drop Panels from
top, insert one side edge and
flex panel until other edge fits
in place.
When two-piece Backs are
used, Center Rail is used on
upper Back only for heights less
than 96”. For heights 96” and
higher, a second Center Rail is
used on the lower Back.
To assemble two-piece Backs
(after Center Rails are in
place), install both lower Back
Panels (refer to
Back Panel
Information
on page 4 for
proper sizes). Install Splicer
Rail over lower Backs and
install upper Back Panels.
Center Rail
Splicer Rail
Second Cen-
ter Rail for
96” & Higher
Only
Assemble remaining framework along chalkline. Do not install
remaining Backs yet!
6.
Chalkline
Island Section Installation