background image

P.O. BOX 3448 • OMAHA, NEBRASKA 68103-0448 • (800) 228-9882

I-7

of 20

0-3F 

REV. AL 

5954 

6/2007 

Lozier® Corporation 2007

5.

Install one Back now for stability. For two-piece Backs, install lower Back Panel only at this time. Refer to 

Back 

Panel Information

 on page 4 for Back Panel Sizes.

Chalkline

Use care in lowering Back

into place. 

DO NOT DROP!

NOTE: 

Top of Pegboard Backs are marked with a 

paint stripe. First row of holes are 

7

/

8

” from 

top edge.

TWO-PIECE BACK DETAIL

NOTE:

 

 If ceiling height is not 

adequate to drop Panels from 

top, insert one side edge and 

flex panel until other edge fits 

in place.

When  two-piece  Backs  are 

used, Center Rail is used on 

upper Back only for heights less 

than 96”. For heights 96” and 

higher, a second Center Rail is 

used on the lower Back.

To assemble two-piece Backs 

(after  Center  Rails  are  in 

place), install both lower Back 

Panels  (refer  to 

Back  Panel 

Information

  on  page  4  for 

proper  sizes).  Install  Splicer 

Rail  over  lower  Backs  and 

install upper Back Panels.

Center Rail

Splicer Rail

Second Cen-

ter Rail for 

96” & Higher 

Only

Assemble remaining framework along chalkline. Do not install 

remaining Backs yet!

6.

Chalkline

Island Section Installation

Отзывы: