Table of Contents
3
© Travis Industries
10/2/17 - 1454
Berkshire MV
Introduction ...................................................... 2
Important Information ...................................... 2
Listing Details ................................................... 2
Features ............................................................ 6
Installation Options .......................................... 6
Heating Specifications ..................................... 6
Dimensions ....................................................... 6
Electrical Specifications (for optional blower)6
Fuel .................................................................... 6
Installation Warnings ....................................... 7
Packing List ...................................................... 7
Additional Items Required ............................... 7
Installation Overview ....................................... 7
Stove Clearances ............................................. 8
Mobile Home Requirements ............................ 8
Heater Placement Requirements .................... 9
Floor Protection Requirements ...................... 9
Electrical Requirements .................................. 9
Optional Wall Switch or Thermostat
Installation ...................................................... 10
Gas Line Installation ...................................... 11
Gas Pressure ...................................................... 11
Vent Requirements ........................................ 12
Altitude Considerations ....................................... 12
Approved Vent .................................................... 12
Vent Installation .................................................. 12
Approved Vent Configurations ..................... 13
Restrictor Position ............................................... 13
Measuring Vent Lengths ..................................... 13
Vertical Terminations with Zero, Two, or Four
45° Elbows ...................................................... 14
Horizontal Termination with One 90° Elbow 15
Horizontal Termination with Two Elbows
(one 90° vertical and one 90° or 45°
horizontal elbow) ............................................ 16
Horizontal Termination with Three 90°
Elbows (all vertical) ....................................... 17
Vertical Terminations with Two 90° Elbows 18
Vertical Terminations with Three 90° Elbows
(Two 90° Vertical and One 45° or 90°
Horizontal Elbow)........................................... 19
Vent Termination Requirements (see
illustration below) .......................................... 20
Class A Chimney Conversion Kit ................. 21
Interior Masonry Chimney Conversions ..... 22
Log Installation .............................................. 23
Steps for Finalizing the Installation ............. 27
Face and Glass Removal .............................. 29
Before You Begin ........................................... 31
Location of Controls - See explanation below31
Starting the Pilot ............................................ 32
Starting the Heater for the First Time .......... 33
Turning the Heater On and Off ..................... 33
Adjusting the Flame Height .......................... 33
Adjusting the Blower Speed (Optional) ....... 34
Normal Operating Sounds ............................ 34
Normal Operating Odors ............................... 34
Power Outages ............................................... 34
Maintaining Your Heater's Appearance ....... 35
Yearly Service Procedure ............................. 35
Troubleshooting Table .................................. 36
Replacement Parts List ................................. 37
Wiring Diagram .............................................. 37
CONDITIONS & EXCLUSIONS ...................... 39
IF WARRANTY SERVICE IS NEEDED: ......... 39
LP (Propane) Conversion Instructions ........ 40
Optional Blower ............................................. 43