36
Optional Equipment
(Qualified Installers Only)
Travis Industries
4041220
9 3 5 0 8 1 2 3
4
Make sure all of the wiring is placed away from the blower impeller and the bottom of the burner. Use
lock ties, if necessary, to ensure no wires are damaged.
5
Open the control cover following the directions below. Remove the button plug and install the
rheostat.
1. Remove the two 3/8” nuts from
the corner plate cover with 3/8” nut
driver.
2. Attach the rheostat to the two
quick connects inside the cover.
(orientation does not matter).
3. Attach the rheostat to the panel
with included nut and washer.
Tighten with 1/2” wrench.
3/8” Nut
Driver
1/2”
Wrench
Rheostat
6
Plug the blower in. Let the heater achieve operating temperature and test blower operation.
Gold Door (part # 99300523)
Follow the directions to the
right to install the optional
gold door.
WARNING:
Clean the gold surface prior
to starting the stove. Any
marks left on the gold may
become etched-in by the
heat of the stove. Use
denatured alcohol and a
soft cloth to clean.
Denatured
Alcohol
Soft Cloth
Remove the black door by sliding
it up and off the door frame.
Slide the gold door onto the door
frame.
HINT: align the bottom joggle
clips over the brackets on the
door and slide into place. Then
lift up slightly on the door to
attach the upper clips.
The door is held in place with four
joggle clips.
Door Frame
Door