53
REG. CODE
1-5302-596
MODEL N°
50881
DATE OF ISSUE
15-05-2003
REVISION
00
DATE
15-05-2003
ENDORSED
COMPILER TECO/ATI
175
R
S
174
176
177
R
P
Q
IX
DISASSEMBLY/REASSEMBLY
Gear assembly measure check
After reassembling the gears, the spacer “
R
” (with the groove facing the shoulder
washer), the shoulder washer “
S
”, with the snap gauge (go and not go) 984980.324,
check the gear assembly measure (mm 132 –0.12 -0.17).
If the gauge does not fit or the play is excessive, replace the shoulder washer with
one of higher or lower size as needed.
Once the check is completed reassemble the snap ring.
IMPORTANT:
the shoulder washer “
S
” is provided, as spare part, in eight different
sizes of thickness. ( 1,750 - 1,830 - 1,910 - 1,990 - 2,070 - 2,150 - 2,230 - 2,310 )
Caption:
1- Gearbox shaft with
differential gear control coil
2- Speed coupling spider
3- Spacer
4- 4th speed gear
5- 3rd speed gear
6- 2nd speed gear
7- 1st speed gear
8- Reverse gear
9- Clearance ring
10- Stop ring
11- Speed control stem
Gearbox shaft
Remove the snap ring “
Q
”, the shoulder washer “
P
” and the gears. Unscrew the
stem “
R
”, set the coupling spiders, one at a time, to coincide with the slot for the
sliding groove and extract them from the shaft.
Reassembling the gearbox shaft
Insert the 1st – 2nd speed coupling spider and reverse “
A
”, caulk by using the
punch 986800.255 at a pressure of Nm 15,500 through a hydraulic
press. Place the 3rd and 4th speed coupling spider “
B
” , and caulk by using the
punch 986800.254.
Содержание LDA 422
Страница 2: ......