![Loma IQ3X Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/loma/iq3x/iq3x_operating-instructions-manual_1938263074.webp)
Operating Instructions
74
Copyright © Loma Systems
Original Document
The PV Test Set Up menu options available are as follows:
Test Type
The following options are available for setting the test type to be used.
l
Normal
Selecting this option enables the normal test process. The size of the Fe (Ferrite), Nfe (Non-Ferrite)
and S.St (Stainless Steel) test pucks being used must first be entered and menu options are
available for these.
When the PV test starts the user will be prompted to pass a sample product pack with the Fe test
puck type attached through the detector where it will be inspected to confirm that the metal
contaminant in the test puck can be detected.
If it cannot then a warning message will be displayed and a larger metal contaminant may need
to be used. Once a successful inspection of the Fe test puck has been completed, the user is
prompted to pass the same sample product pack with the test puck attached through the
detector a number of times, set in the Number of passes option, until they have all passed
inspection and the test is complete in the PVS screen as shown below.
The user is then prompted to repeat the above process for the Nfe and then the S.St test pucks.
Once all testing has been completed successfully, normal inspection can be continued.
The test pucks are colour coded RED – Fe (Ferrite), YELLOW – NFe (Non-Ferrite) and
BLUE – S.St (Stainless Steel).
l
Sequential
Selecting this option enables the sequential process which is basically the same as the Normal
process with the exception that each of the test puck types is passed one after the other
through the detector rather than one type at a time until they have all passed inspection and
the test is complete.
Timing
The following options are available for setting the test timing to be used.
l
Off
Selecting this option means that the user will initiate a PV test manually from the Menus > Run PV
Test menu.
l
Interval
Selecting this option means that the user will be automatically prompted to initiate a PV test
after a specified time, subject to a minimum interval of 6 minutes.
l
Batch
Selecting this option means that the user will be automatically prompted to initiate a PV test
when a new batch is started or when a batch ends.
Содержание IQ3X
Страница 2: ...Version Number Date Reason 1 29 07 2019 Initial Release ...
Страница 28: ...Thispage intentionally left blank ...
Страница 33: ...33 Operating Instructions Original Document Copyright Loma Systems 3 9 IQ3X Display Menu Map ...
Страница 38: ...Thispage intentionally left blank ...
Страница 78: ...Thispage intentionally left blank ...
Страница 88: ...Thispage intentionally left blank ...