background image

Declaration of 
conformity

Logosol AB, 
Fiskaregatan 2, 
SE-871 33 Härnösand, Sweden
Tel. +46 611 18285

hereby declares that 

Logosol Trailer kit 

1300 kg for B751 PRO / B1001

has been manufactured in conformity with: 
Supply of Machinery (Safety) Regulations 
2008

and has been manufactured in conformity 
with the following harmonised standards:  
BS EN ISO 12100:2010

Fredrik Forssberg, CEO, is responsible for 
the technical files.

Härnösand 2022-11-23

Fredrik Forssberg

, CEO

Declaration of Conformity

In accordance with Directive 2006/42/EC, Annex 2A

Logosol AB
Fiskaregatan 2
871 33 Härnösand

hereby declares that Logosol 

Trailer Kit 1300 kg  

for B751 PRO / B1001

has been manufactured in conformity with: 
the Machinery Directive 2006/42/EC

and has been manufactured in conformity with  
the following harmonised standards: 
EN ISO 12100:2010

Fredrik Forssberg, CEO, is responsible for technical 
documentation.

Härnösand, 2022-11-23

Fredrik Forssberg, VD

Fiskaregatan 2, S-871 33 Härnösand, SWEDEN

Phone +46 611 18285 | [email protected] | www.logosol.com

Содержание 0458-395-0711

Страница 1: ...USER MANUAL TRAILER KIT 1300 KG B751 PRO B1001 EN SKU 0458 395 0711 REV 1...

Страница 2: ...nstructions WARNING Incorrect use can result in serious or fatal injuries to the operator or others We are very pleased that you have demonstrated your confidence in us by purchasing this machine and...

Страница 3: ...3 TRAILERKIT 1300 KG Safety instructions 4 Components 6 Component parts 7 Assembly 10 TABLE OF CONTENTS...

Страница 4: ...n case you need help Only add extra equipment to the sawmill that is made by Logosol or that is specifically approved by Logosol for the purpose Other equipment may result in risk of accident and must...

Страница 5: ...mill on a level surface with at least 5 m of clear obstacle free space all around the machine If the band sawmill is to be set up permanently we recommend supporting the bandsaw rails on cement slabs...

Страница 6: ...2 11 Screw M6SF M8x10 8 8 fzb 04 00155 GN352 30 15 M8 E55 04 00589 Coupling head ISO 50 1500kg M6SF DIN 6921 M8x25 8 8 fzb 4 2 30 1 Screw M6SF M8x10 8 8 fzb 29 04 00155 1 GN352 30 15 M8 E55 1 28 04 00...

Страница 7: ...042 04 00576 03 03011 1 x 1 x 1 x 2 x 2 x 2 x 2 x 2 x 2 x 2 x 1 x 2 x 2 x 1 x 1 x 1 x 8 x 1 x 1 x 1 x 2 x 04 00558 2 x 8310 001 0050 x3 02 00475 03 03020 2 x 2 x 2 x 2 x 02 00474 04 00549 B1001 B1001...

Страница 8: ...x M8x12 4 x M8x20 4 x M8x25 4 x M10x65 4 x M12x100 4 x M12x30 20 x M12x90 NV18 8 x M12x140 24 x M12 NV18 3 x M8x16 24 x M12 4 x M8 8 x M12 5 x M8 4 x M10 5 x M8 3 x M8 5 x M8x16 01 00668 2 x Cylindric...

Страница 9: ...nsion M ISO 68 1 This is followed by a length dimensions for bolts screws the dimen sion of a bolt screw is the part of the bolt screw that disappears into the material in which it is mounted ADDITION...

Страница 10: ...ful not to unscrew the bolts screws too much as this could cause the nuts to fall out Install the wheels of the sawhead on the tip protection plate Use the washers and nuts from the existing assembly...

Страница 11: ...l pipe 3 hole pair 2 from the right The wheel axle is located on rail pipe 3 hole pair 2 from the right Standard shelves Standard shelves Standard shelves Rail pipe 1 Rail pipe 1 Support leg Support l...

Страница 12: ...12 8 x M10 4 x M12 4 x M12 4 x M12x100 NV18 B751 PRO B1001 B1001 B751 PRO 8 x M10x70 1 2 3 8310 001 0050 1 x 01 00614 skp...

Страница 13: ...13 TRAILERKIT 1300 KG 4 3 2 1 x 4 x M12 4 x M12 1 x M8x10 4 x 4 x 1 20 x M12 NV18 20 x M12x90 NV18 78 5mm 01 00668 1 x 01 00668 skp Use the existing parts from the sawmill...

Страница 14: ...the end piece at the end of the rail pipe Note that the drawbars for the trailer kit must be mounted at the end of the rails in terms of the saw direction Install the outer drawbar on the rail end Fi...

Страница 15: ...T 1300 KG 8 9 2x 2x 4 x M10 4 x M10x65 01 00668 Place the carriage drawbar in the outer position for transport The drawbar can be removed when sawing if it is considered to be in the way POSITION OF T...

Страница 16: ...x16 6 x M8 6 x M8x16 2 x 01 00737 skp Install the wheel axle mounts on the rails Note the longitudinal position on the rail during assembly Mount the brackets on the third rail pipe hole pair 2 Mount...

Страница 17: ...s Mount the fittings for the sawhead s lock ing mechanism on the main posts Note that on the exhaust side of the sawhead a spacer must be mounted between the locking plate and the main post Mount the...

Страница 18: ...4 x M12 4 x M12x100 78 5mm 1 Transport mode During transport mount the fittings for the sawhead s locking mechanism on the bottom plate of the respective rail pipes 2 Working mode When the saw is in...

Страница 19: ...l so that the wheels are level with each other Verify this with the help of a spirit level Then adjust the drawbar support wheels so that the log bed is also longitudinally level Then drop down the su...

Страница 20: ...les H rn sand 2022 11 23 Fredrik Forssberg CEO Declaration of Conformity In accordance with Directive 2006 42 EC Annex 2A Logosol AB Fiskaregatan 2 871 33 H rn sand hereby declares that Logosol Traile...

Отзывы: