25
Grain Bag Loader OM
Set-up Instructions
Initial Set-up (Cont’d)
Swing Hopper Hoist Installation (GBL12
only)
1
Install a lifting chain (1) onto the swing hopper hoist .
1
Move the swing hopper hoist towards the main auger
frame . Align the swing hopper hoist with the mounting
plate and install bolt (1), flat washer (both sides) and nut .
1
Slowly lower the swing hopper hoist until the mounting
holes are aligned .
Install the bolt (1), flat washer (both sides) and nut . Tighten
the two bolts to securely fasten the swing hopper hoist to
the main auger frame .
2
1
Route the two wires (1) from the electric winch to the
control panel (2) . Install the two wires into the control
panel . See “Wiring Diagram (N157277) - GBL12 and
GBL12C” on page 129 for the correct wire locations .
Содержание GrainLogix GBL12A
Страница 2: ......
Страница 4: ......
Страница 10: ...2 Grain Bag Loader OM...
Страница 22: ...14 Grain Bag Loader OM...
Страница 76: ...68 Grain Bag Loader OM Maintenance...
Страница 77: ...69 Grain Bag Loader OM Parts Identification PARTS IDENTIFICATION AND SCHEMATICS...
Страница 99: ...91 Grain Bag Loader OM This page intentionally left blank Parts Identification...
Страница 142: ...134 Grain Bag Loader OM...
Страница 147: ...139 Grain Bag Loader OM Appendix Torque Specifications Inches Hardware and Lock Nuts...
Страница 148: ...140 Grain Bag Loader OM Appendix Torque Specifications Cont d Metric Hardware and Lock Nuts...
Страница 149: ......