background image

 

3

PROJECT 2000 PRESENTATION

 

 

Thank you for choosing Lofrans.  The Project 2000 is the new Lofrans windlass , designed for boat from 18 (59’) up to 25 mts (82’) length . Listed below are the technical features : 

 

Chromed Bronze finish as standard 

 

Nominal power with S2 parameter  60 minutes : 2000W 24V  

 

Peak power with S2 parameter 1 minute : 4000W 24V 

 

Available in AC motor : Three phases – Single phase (ask for details) 

 

Nickeled chain gipsy 

 

Cone clutches equipped 

 

Main shaft in stainless steel AISI 431 

 

 

Base bearing in stainless steel AISI 440 

 

Independent drum from gipsy 

 

Manual override equipped 

 

Haulage speed : from 18 up to 24 mt/min 

 

Ampere load : from 90  - 110 A  

 

Max pull measured with dynamometer : Kgs 1800 approx 

 

Weight : Kgs 73 

 

SAFETY INFORMATION

 

 

 

This product is not designed as a strong point to fasten your anchor rode. Fast the anchor rode to a strong point such as mooring cleat or similar. 

 

The vessel’s engine should always be running and used to assist in the recovery of the ground tackle. 

 

Always install the properly rated circuit breaker to protect the electric circuit and the motor from overheating and damage. 

 

Always turn off the main switch when the windlass is not in use to prevent accidental engagement. 

 

Always keep hands and feet clear of an operating windlass.If a jam occurs turn the windlass off at the main switch before clearing the anchor rode. 

 

Do not use the windlass for different purposes it was designed for. 

 

WINDLASS WIRING MINIMUM REQUIREMENTS

 

 

Below there are the requirements for all the components of the windlass electric plant depending from the motor nominal power . 

 

 

2000 W 24V 

A-Battery capacity  

150 Ah 

B-Power cables size  

50 mm² - 1 AWG 

C-Lofrans Circuit breaker (slow time/current curve) 

100 A 

    Fuse 

5 A 

    Control wires size 

1,5 mm² - 14 AWG 

 

Notes

 

 

A.

 

Battery of lower capacity decrease the windlass performances and are rapidly subjected to wear and tear. 

B.

 

This size must be increased  when the length of the positive plus the negative cables are more than 25 mts. Use marine grade tinned copper wire. 

C.

 

The Lofrans circuit breaker protects the power line  from short circuit and the windlass motor in case of overheating. It must be kept dry and installed in accessible place to be 

promptly reactivated when it trips. It can be also used to isolate the windlass from the remote controls as we strongly suggest to avoid accidental engagement.  

All the switches must be wired in parallel. We strongly recommend to have a minimum of two switches to operate the windlass in case one of them gets damage. 

All Lofrans equipment is CE approved.  

 

INSTALLATION GENERAL REQUIREMENTS

 

 

Proper installation of the windlass is critical and these essential conditions listed below need be fully satisfied :  

Fig.1 

The gipsy of the windlass must be in line with the bow roller. 

Fig.2 

The deck must be flat. The structure of the boat must be adequate  to the load that the windlass is able to pull. If necessary reinforce the deck with a backing pad to spread the 

stress. 

Fig.3 

When determining the position of the windlass , it is critical to locate it directly above the deepest area of the chain locker. As the chain falls into the chain locker , it must be  

maximized because when the chain is stored. The chain tends to gather in the shape of a pyramid , which reduce the available space. If the chain pyramid falls , then overlaps 

may occur, resulting in jams. The deeper the locker , the less likely this will occur. You must have a minimum of A=12” between the underside of the deck and the  top of the 

heaped chain. The chain locker shape is really important to limit the pyramid problem. The chain coming from the bow roller can be inclined up to 5 degrees. 

 

INSTALLATION PROCEDURE

 

 

Fig.4 

Carefully position the template provided to the deck . Mark and drill the holes as indicated (see Fig.A). Sand smooth all edges and seal (see Fig.B). Clean the deck area. 

Fig.5 

Loosen the 4 hex nuts (391) to separate the topworks from the gearbox and motor. Seal the windlass base with high quality sealant. Position the topworks on the deck. 

Fig.6 

Join the gearbox to the windlass topworks by inserting the main shaft into the way of the gearbox. Align the motor away from the chain pipe.  

Fig.7 

Fasten a washer ,lock washer and hex nut to the remaining deck studs. Tighten all hardware properly. Connect  the cables from the battery to the electric motor as shown in the 

electric diagram. 

 

TEST PROCEDURE

 

 

 

Fig.8 

Introduce the chain into the gipsy . Please take care to keep hands and feet away of the incoming chain. 

Fig.9 

Turn on the remote control. Operate the UP switch. The chain will be recovered. Release the UP switch.Operate the DOWN switch. The chain  will be released. If the windlass 

runs in wrong direction change over the UP and DOWN wires at the control box. 

Fig.10  After using the windlass , we strongly recommend that the nuts are checked again to ensure they are well tightened. 

 

 

 

 

 

 

 

 

 

 

 

Содержание PROJECT 2000 USA

Страница 1: ...M 038 03 06 Rev 00 PROJECT 2000 USA INSTRUCTION MANUAL MANUALE DI ISTRUZIONI MANUEL D INSTRUCTIONS GEBRAUCHSANWEISUNG MANUAL DE INSTRUCCI NES...

Страница 2: ...Pg 11 Conditions requises minimum pour le circuit lectrique Pg 9 Sch ma lectrique Pg 18 Conditions requises general pour l installation Pg 9 Figures Pg 19 Proc dure d installation Pg 9 Sch ma d taill...

Страница 3: ...to avoid accidental engagement All the switches must be wired in parallel We strongly recommend to have a minimum of two switches to operate the windlass in case one of them gets damage All Lofrans eq...

Страница 4: ...in stopper If using a combination of rope and chain fix the rope to a strong point such as a cleat Engage the brake 5 RAISING THE ANCHOR Disengage the chain stopper Check if the clutch is engaged Dise...

Страница 5: ...warranty starts from the date of purchase of the boat 3 This warranty covers original defects in material and workmanship 4 This warranty is limited to the repairment and or the replacement of the or...

Страница 6: ......

Страница 7: ...19 PICTURES Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 Fig 6 Fig 7 Fig 8 Fig 9 Fig 10 These pictures are intended for guide only...

Страница 8: ......

Страница 9: ...hd screw M8x25 Kit B 11 395 Seal 50x70x10 Kit A 2 396 Bearing 16010 2 399 Pawl 2 400 Circlip 15 Din 471 Kit D 4 401 Pivot 2 402 Hex hd screw M6x16 Kit B 3 403 Spring 2 404 Hex hd screw M6x25 Kit B 2...

Страница 10: ...Malo MALTA INTERNATIONAL MARINE CENTRE Ta Xbiex Palace Testaferrata Street Msida SPAIN LA INDUSTRIAL VELERA MARSAL S A Muntadas 8 y 10 08014 Barcelona IMNASA S A Adva Zaragozza 73 75 17220 Sant Feliu...

Отзывы: