10 - Maintenance
The BWSS is designed mechanically and electronically for durability and accuracy. The load cell in the
BWSS needs to be calibrated once a year.
The calibration is performed using calibration equipment specially designed by the manufacturer.
Cleaning
Cleaning
The BWSS can be cleaned with a cloth dampened with non-aggressive liquid.
Replacing fuses
Replacing fuses
There are two fuses in the power supply unit. Figure 3
Note: make sure that 250V 5A fuses are used
Always disconnect the power cord first!
Replacing the springs
Replacing the springs
The springs need to be replaced after approximately 2500 trainings.
Replacement of the springs needs to be done by a qualified service engineer.
Always disconnect the power cord first!
Contact your local dealer for a maintenance contract or ask Lode:
LODE BV
Tel. +31 50 5712811
Fax. +31 50 5716746
Service department
Zernikepark 16
9747 AN GRONINGEN
The Netherlands
Email: [email protected]
www.lode.nl
18/21
M932822 / VERSION: 1.0 - 2020-07-23
Содержание BWSS
Страница 3: ...20 21 13 Science 14 Specifications ...