background image

1  

Service

        

                       Service Manual

1  

Service 

(continued)

ModBus

When BMS is set to ACTIVE (see BMS Active / Inactive) 
and the boiler is being controlled through ModBus, set 

ModBus

 parameter to ACTIVE.  Otherwise, set the 

ModBus

 

parameter to INACTIVE.  Note that the boiler can still 
be monitored by ModBus with this parameter set to 
INACTIVE.  The default value is INACTIVE.

ModBus T/O

The amount of time the unit controls will wait to receive 
a communication string from the BMS controller before 
reverting back to its own internal parameters. This 
parameter is adjustable by the installer by accessing the 

ModBus T/O

 parameter

.  

The adjustment range of this 

parameter is 5 seconds to 2 minutes. 

 

The default value is 

10 seconds.

Cascade Address

The boiler designated as the Leader needs to be programmed 
with address 0.  All the Member boilers require addresses 
from 1 to 7, and the addresses must be different for each 
Member.  The addresses can be in any order, regardless 
of the order in which the units are wired together.  This 
parameter is adjustable by the installer by accessing the 

Cascade Address

 parameter.  The outdoor air (if used) and 

system supply sensor must be connected to the Leader 
boiler.  The default address is 1.

If installing the boilers in an existing system, the new 
boilers should be programmed as the Leader and/or the 
higher number addresses.

Cascade Type (L/L / EFF)

There are two (2) options for the way a Cascade divides the 
load between its heaters.  The first is Lead/Lag, designated 
as L/L in the menu.  This method is used when it is desired 
to have the least amount of total flow through the boilers.  
This method will modulate the last two (2) boilers.  This 
provides for smooth transitions when a boiler turns on or 
off.  When the last boiler reaches 100% and the calculated 
load is still increasing, it will start the next boiler at 20% 
and reduce the previous boiler to 80%, thus eliminating 
the sudden jump in total output of the Cascade.  When the 
calculated load is decreasing and the last boiler gets down 
to 20% fire, it will hold it there and start lowering the firing 
rate on the next-to-last boiler.  When the next-to-last boiler 
reaches 20%, it will turn the last boiler off and raise the 
rate of the next-to-last boiler to 40%, thus eliminating the 
sudden drop in total output of the Cascade.

The other Cascade divider method is Efficiency 
Optimization, designated as EFF in the menu.  This 
method is used, as the name implies, when it is desired 
to have the most efficient system.  When the first boiler 
reaches a certain rate (default = 90%), it lowers its rate 
to 45% and turns on the next boiler at 45%.  The two (2) 
boilers then modulate at the same rate.  

As the calculated load increases further and both boilers ramp 
up to 90%, it lowers the rate of the first two (2) boilers to 60% 
and brings the next boiler  on at 60%.

   

The three (3) boilers 

then modulate together.   As the calculated load decreases, the 
boilers will reach a lower threshold (default = 30%), at which 
time the last boiler (the third in our example) will turn off and 
the Cascade will increase the rates of the remaining boilers to 
provide the equivalent total output as before ((3 x 30%) / 2 = 
45% in our example).

Maximum Cascade Set Point

This parameter determines the set point used by the individual 
boilers in a Cascade.  When a boiler is commanded to fire by 
the Leader boiler, it will attempt to achieve this temperature at 
its outlet.  The Leader boiler will limit the modulation of the 
last boiler to fire in order to hold the temperature at the system 
supply sensor to the user set point.  If any of the boiler outlet 
temperatures reach the maximum cascade set point, the boiler 
will then modulate down on its own in order to keep its outlet 
temperature within the maximum cascade set point.  Therefore, 
this parameter can be used to limit the outlet temperatures of 
all the boilers in a Cascade.  Note that this parameter does 
not apply when the boiler is heating an indirect DHW tank.  
This parameter is adjustable by the installer by accessing the 

Maximum Cascade Set Point

 parameter

.  

The temperature 

range of this parameter is 32° (0°C) to 190°F (88°C).

   

The 

default maximum cascade set point is 185°F (85°C).

Cascade Offset

This parameter determines how much the temperature must 
go above set point before the lead boiler will turn off.  This 
parameter can be adjusted by the installer by accessing the 

Cascade Offset

 parameter.  The temperature range of this 

parameter is 0° to 20°F (11°C) The default value is 10°F (6°C).

Cascade Differential

This parameter determines how much the temperature must 
go below the turn off temperature (Set point + Offset) before 
the lead boiler turns on.  This parameter can be adjusted by the 
installer by accessing the 

Cascade Differential

 parameter.  The 

temperature range of this parameter is 0°F to 60°F (33°C) The 
default value is 20°F (11°C).

Minimum On/Off Time

In order to prevent units in a Cascade from short cycling, 
this parameter defines the minimum ON and OFF time for 
each unit.  The installer can adjust this time by accessing the 

Minimum On/Off Time

 parameter.  The minimum setting is 0 

seconds and the maximum setting is 10 minutes.  The default 
is 30 seconds.

Minimum Next On Time

In order to reduce the risk of temperature overshoot with 
a Cascade, this parameter defines the minimum time delay 
from starting one unit until the next unit may be started.  The 
installer can adjust this time delay by accessing the 

Minimum 

Next On Time

 parameter.  The minimum setting is 0 minutes 

and the maximum setting is 10 minutes.  The default is 60 
seconds.

25

Содержание Knight 81 - 286

Страница 1: ...an Read all instructions including this manual and the Knight Boiler Installation and Operation Manual before installing Perform steps in the order given Failure to comply could result in severe perso...

Страница 2: ...but not related to personal injury or property damage CONTENTS 2 Hazard Definitions 2 PLEASE READ BEFORE PROCEEDING 3 Handling Ceramic Fiber Materials 3 When servicing boiler 4 Boiler operation 4 Boil...

Страница 3: ...stalline silica in the form of quartz or cristobalite from occupational sources is carcinogenic to humans Group 1 Normal operating temperatures in this appliance are below the level to convert ceramic...

Страница 4: ...ve sediment The high efficiency heat exchanger can be damaged by build up or corrosion due to sediment Do not use petroleum based cleaning or sealing compounds in the boiler system Gaskets and seals i...

Страница 5: ...Knight boiler operation General Temperature Setting Data Logging Functions DHW Settings Outdoor Reset Anti cycling Control Modes Circulation Pumps Building Management System BMS Service Notification...

Страница 6: ...YPICAL TO SYSTEM FROM SYSTEM FROM TO SYSTEM SENSOR AIR SEPARATOR Near boiler piping This piping reference is included to specify the Near Boiler Piping specific to the Knight boiler This piping scheme...

Страница 7: ...DIAL The Knight boiler display The information on the bottom of the display shows the functions of the two SELECT keys on either corner and the NAVIGATION dial in the center MENU Left SELECT Key SETP...

Страница 8: ...BUILDING MANAGMENT SYSTEM LOW VOLTAGE CONNECTION BOARD INLET TEMPERATURE SENSOR OUTLET TEMPERATURE HI LIMIT SENSOR FLUE GAS SENSOR LOUVER PROVING SWITCH FLAME SENSOR LOW WATER CUTOFF BLOCKED DRAIN SW...

Страница 9: ...ice continued LOW VOLTAGE CONNECTION BOARD SMART CONTROL MODULE ALARM BELL LOUVER RELAY RUN TIME CONTACTS BUILDING MANAGEMENT SYSTEM BOILER PUMP SYSTEM PUMP DHW PUMP IGNITOR BLOWER GAS VALVE DISPLAY P...

Страница 10: ...ture boiler return water temperature or system supply temperature depending on the parameter setting Sequence of operation Table 1 1 shows control module normal sequences of operation for space heatin...

Страница 11: ...ol starts a 15 second prepurge cycle by initiating the blower 5 The control starts a 4 second trial for ignition by firing the spark electrode and opening the gas valve 6 If flame is not detected with...

Страница 12: ...en modulate to maintain the outlet temperature to the DHW boiler set point 9 If the boiler is not part of a Cascade and both the space heating and DHW calls for heat remain active long enough the boil...

Страница 13: ...the LEFT SELECT soft key MENU for five 5 seconds Rotate the NAVIGATION dial clockwise until 5 is displayed first digit on the left Press the NAVIGATION dial to select the next digit Rotate the NAVIGAT...

Страница 14: ...next to TEMPERATURE SETTINGS Press the NAVIGATION dial one time Rotate the NAVIGATION dial counterclockwise until the arrow is next to MIN SETPT Press the NAVIGATION dial one time Rotate the NAVIGATIO...

Страница 15: ...9 No No Yes Yes DHW Night Setback Off Times 19 No No Yes Yes Night Setback Override 19 Yes Yes Yes Yes Display Timeout 20 No No Yes Yes SH1 Set Point 20 Yes Yes No No Minimum SH Set Point 20 No No Yes...

Страница 16: ...Yes Outdoor 1 High 22 No No Yes Yes Set Point 1 at Low Outdoor Temp 1 22 No No Yes Yes Set Point 1 at High Outdoor Temp 1 22 No No Yes Yes Outdoor Air Shutdown SH1 22 No No Yes Yes Outdoor Air Shutdo...

Страница 17: ...tat Input 24 No No Yes Yes BMS 24 No No Yes Yes ModBus 25 No No Yes Yes ModBus T O 25 No No Yes Yes Cascade Address 25 No No Yes Yes Cascade Type 25 No No Yes Yes Max Cascade Set Point 25 No No Yes Ye...

Страница 18: ...Volts at Max 26 No No Yes Yes Rate at Min Volts 26 No No Yes Yes Rate at Max Volts 26 No No Yes Yes Set Point at Min Volts 27 No No Yes Yes Set Point at Max Volts 27 No No Yes Yes On Volts 27 No No Y...

Страница 19: ...t within a single day if desired When a start trigger and a stop trigger are set to the same time the stop trigger has priority The installer may adjust the space heating night setback start triggers...

Страница 20: ...is 0 F and the maximum is 20 F The default setting is 5 F 2 8 C Rotate the NAVIGATION dial to select the trigger you wish to skip and press the NAVIGATION dial SK will appear next to that trigger You...

Страница 21: ...to the DHW demand The installer can adjust the length of time the boiler will service the space heating demand by accessing SH DHW Switching Time parameter The minimum setting is 0 minutes and the max...

Страница 22: ...value is 70 F 21 C Set Point 1 3 at Low Outdoor Temperature When the outdoor air temperature drops to the Outdoor 1 3 Low parameters the calculated set point will be at this setting FIG 1 1 If the out...

Страница 23: ...r Shutdown Differential SH1 SH2 and SH3 parameters The temperature range of this parameter is 0 F 0 C to 54 F 30 C The default value is 10 F 6 C Shift Reset Curve SH1 SH3 There is a shift reset curve...

Страница 24: ...he 0 10V input in the case of 0 10V BMS control or the 0 10V input value received through ModBus The default value is INACTIVE When finished the installer can press the RIGHT SELECT SAVE key to store...

Страница 25: ...lated load increases further and both boilers ramp up to 90 it lowers the rate of the first two 2 boilers to 60 and brings the next boiler on at 60 The three 3 boilers then modulate together As the ca...

Страница 26: ...um value is the Rate at Minimum Volts setting and the maximum is 100 The default value is 100 Circulation pumps System Pump Delay The system pump delay parameter sets the length of time the system pum...

Страница 27: ...r by accessing the Service Notification Running Time parameter The time range for this parameter is 0 hours to 17 500 hours The default time is 8 760 hours Service Notification Cycles When the boiler...

Страница 28: ...t Installation and Operation Manual Flame inspection stable uniform Flame signal at least 10 microamps at high fire Clean the heat exchanger if flue temperature is more than 54 F above return water te...

Страница 29: ...the air and vent lines per this manual and the Knight Boiler Installation and Operation Manual Inspect boiler interior 1 Remove the front access cover and inspect the interior of the boiler 2 Vacuum a...

Страница 30: ...Boiler Installation and Operation Manual before proceeding further Safety relief valves should be re inspected AT LEAST ONCE EVERY THREE YEARS by a licensed plumbing contractor or authorized inspecti...

Страница 31: ...nt procedures 2 Check settings of external limit controls if any and adjust if necessary Perform start up and checks 1 Start boiler and perform checks and tests specified in Section 10 Start up of the...

Страница 32: ...ow the heat exchanger to thoroughly dry 10 Remove the field supplied rear refractory cover from the back of the combustion chamber of the heat exchanger and reassemble 11 Close isolation valves on pip...

Страница 33: ...r with boiler on Minimum 4 inches w c natural 8 inches w c LP with gas flowing verify during boiler startup Check control module fuses ALWAYS check control module fuses before replacing control module...

Страница 34: ...emote thermostat setting Outside air temperature above Warm Weather Shutdown WWSD set point for main control board Check location of outside air sensor Check resistance of outdoor air sensor and compa...

Страница 35: ...It is important to note that the flue and outlet water sensors have two temperature sensing devices in one housing These devices are designated as S1a S1b outlet sensor and S3a S3b flue sensor Please...

Страница 36: ...r replace the burner as necessary Low water flow through the heat exchanger Refer to Section 6 Hydronic Piping of the Knight Boiler Installation and Operation Manual for minimum flow rates Verify that...

Страница 37: ...laced jumper on the Low Voltage Connection Board Check for the addition of a device wired across the gas pressure switch terminals on the Low Voltage Connection Board Flow Switch LWCO will require a m...

Страница 38: ...Applies to the 286 Model Only Inspect the back of the inner combustion chamber at burner level for refractory breakdown missing Replace heat exchanger if refractory is broken and unit has fired Check...

Страница 39: ...valve is not connected and will display the Gas Valve or Gas Valve Fail fault If 24 vac is present check the outlet of the valve to ensure the valve is flowing gas With a manometer connected to the o...

Страница 40: ...pump is a variable speed pump ensure that the system flow is not less than the boiler flow If operating on something other than an outlet sensor check temperature setting of the main control board If...

Страница 41: ...splay to reset The actual fan RPM is 30 lower than what is being called for Vent air intake lengths exceed the maximum allowed lengths Refer to Section 3 General Venting of the Knight Boiler Installat...

Страница 42: ...sensor as open or shorted Check wiring to sensor Make sure wiring is connected and not damaged Reconnect repair wiring if necessary Measure the resistance of the sensor and compare to the resistance i...

Страница 43: ...connect repair wiring if necessary Measure the resistance of the sensor and compare to the resistance in Table 3 2D on page 35 of this manual Replace sensor if necessary Restore control parameter defa...

Страница 44: ...and Operation Manual for the proper piping methods for the Knight boiler Check for 120 vac to the boiler pump motor on a call for heat If voltage is not present check the wiring back to the main cont...

Страница 45: ...arameters from a laptop the main control board must be reset Press the ENTER RESET button on the SMART SYSTEM display panel Service Blk While the unit is in Service Mode the outlet temperature has exc...

Страница 46: ...O2 O2 8 0 10 3 0 6 5 9 0 11 4 1 6 9 8 Once the combustion analysis is complete test the safety shutoff device by turning the manual shutoff switch to the OFF position and ensuring that the boiler shut...

Страница 47: ...y Gas Valve Adjustment Refer to this page for the gas valve adjustment procedure Gas valve adjustment procedure If adjustment of the gas valve is deemed necessary use the following procedure Locate th...

Страница 48: ...he Knight upgrade Revision B ECO C06234 reflects changes made to the Service Notification parameter Revision C ECO C07981 reflects changes made to the parameter table parameter descriptions updates to...

Отзывы: