
Revision Notes: Revision A (ECO #C06238) initial release.
Revision B (ECO #C07442) new layout in InDesign, piping diagram on
page 43 (ECR #R03671), and edits made to the Ratings Page (page 7).
Revision C (ECO #C07575) changes made (mixing valves) to the piping
diagrams on pages 39 - 43, changes made to the gas supply piping
images on page 44 (ECR R03740), the addition of the rope gasket
notice on page 71 (ECR R03940), change water pipe clearances from
1" to 1/4" (ECR R04077), and changes made to Table 3A on page 19.
Revision D (ECO #C08817) reflects the addition of the O-temp switch,
additional information added to the humidity warning on page 8, and
changes made to FIG. 8-1 on page 48.
Revision E (ECO #C09197) reflects updates made to the SMART
SYSTEM control (ECR #R04523).
Revision F (ECO #C09803) reflects the addition of the new Polypropylene
Vent material section, rearranging the venting section, and the addition
of the AHRI and ASME logos (R05009).
Revision G (ECO #C10143) reflects updates made to the ignition timing
information.
AWII-I-O Rev G
04/12