background image

 

47 

16.0

 

SMART SYSTEM CONTROL SETTINGS 

 
 

16.1

 

ENTERING THE INSTALLER CODE 

 
To access the user control the following procedure should be followed: 
 

1.

 

If the boiler is operating, press the 

Enter/Reset

 button to turn the unit off. 

2.

 

Press and hold the 

Menu/Exit

 button for 5 seconds.  At this point the display will change to show: 

Enter Menu Code: 

 

 

0000 

3.

 

Press the 

UP

 button 9 times.  The display should now show: 

Enter Menu Code: 

 

 

0009 

4.

 

Press the 

Previous

 button 2 times.  The display should now show: 

Enter Menu Code: 

 

 

0009 

5.

 

Press the 

Up

 button 3 times.  The display should now show: 

Enter Menu Code: 

 

 

0309 

6.

 

Press the 

Previous

 button.  The display should now show: 

Enter Menu Code: 

 

 

0309

 

7.

 

Press the Up button 5 times.  The display should now show: 

Enter Menu Code: 

 

 

5309

 

8.

 

Press the 

Enter/Reset

 button.  The display should now show: 

Enter Menu Code: 

 

 INSTALLER CODE 

 
In addition to menu sets A, B, C, E and F (as detailed in the User Guide) the installer has access to various other 

menus and further options in the user menus.  By pressing the 

Up

 and 

Down

 buttons the various menu sets can be 

selected and then accessed using the 

Enter/Reset

 button. 

 

16.2

 

MENU SET B:  TEMP SETTINGS 

 

16.2.1

 

CH MINIMUM SETPOINT 

 

The  CH  minimum  setpoint  parameter  sets  the  minimum  water  temperature  set  point  that  can  be  used  for  central 

heating operation.  The user or installer will not be able to program the control with a lower CH set point.  
 

The setpoint can be adjusted using the 

Up

 and 

Down

 buttons on the control panel.  Once the desired setpoint is 

displayed, the 

Enter/Reset

 button should be pressed to store the value.  The default value is 21

C, the minimum 

value is 0

C and the maximum value is 115

 

16.2.2

 

CH MAXIMUM SETPOINT 

 

The CH maximum setpoint parameter sets the maximum water temperature set point that can be used for central 
heating operation.  The user or installer will not be able to program the control with a higher CH set point.  

 

The setpoint can be adjusted using the 

Up

 and 

Down

 buttons on the control panel.  Once the desired setpoint is 

displayed, the 

Enter/Reset

 button should be pressed to store the value.  The default value is 21

C, the minimum 

value is 0

C and the maximum value is 115

 

 

 

Содержание EcoKnight EKB115CE

Страница 1: ...range High Efficiency Gas Fired Condensing Boilers Installation Commissioning and Maintenance Instructions Models EKB45CE EKB60CE EKB85CE EKB115CE EKB145CE EKB175CE EKB205CE EKB235CE INS0009 Issue No...

Страница 2: ...ARDING 23 9 0 AIR SUPPLY 24 9 1 COMBUSTION VENTILATION 24 9 2 COOLING VENTILATION 24 10 0 WATER CONNECTIONS 25 10 1 GENERAL 25 10 2 OPEN VENTED SYSTEM ARRANGEMENT 25 10 3 SEALED SYSTEM ARRANGEMENT 25...

Страница 3: ...16 3 1 RESET LAST 10 ERRORS 48 16 3 2 SERVICE MODE DELAY 48 16 4 MENU SET E DHW SETTINGS 48 16 4 1 DHW SETPOINT 48 16 4 2 CH DHW SWITCHING TIME 48 16 5 MENU SET F OUTDOOR RESET 49 16 5 1 MINIMUM AIR...

Страница 4: ...propane firing is to be found in Section 14 LPG FUEL This equipment MUST NOT use gas other than that for which it has been designed and adjusted This equipment must be installed by a competent person...

Страница 5: ...14 Gas connection pipe Threaded pipe connection 1 2 3 4 or 1 depending on the model This pipe should be connected to the incoming gas supply for the purpose of delivering gas to the boiler 15 SMART Co...

Страница 6: ...6 FRONT VIEW MODELS EKB45CE EKB60CE LEFT SIDE INSIDE UNIT MODELS EKB45CE EKB60CE REAR VIEW MODELS EKB45CE EKB60CE RIGHT SIDE INSIDE UNIT MODELS EKB45CE EKB60CE...

Страница 7: ...7 REAR VIEW MODEL EKB85CE EKB115CE REAR VIEW MODEL EKB145CE LEFT SIDE INSIDE UNIT MODEL EKB85CE EKB115CE LEFT SIDE INSIDE UNIT MODEL EKB145CE...

Страница 8: ...8 REAR VIEW MODEL EKB175CE EKB235CE LEFT SIDE INSIDE UNIT MODEL EKB175CE EKB235CE...

Страница 9: ...ction size BSP 1 WATER DATA Water content litres 4 9 6 4 9 1 12 9 15 9 15 9 18 9 21 6 Water connections F R BSP 1 2 Max water pressure PMS bar 11 0 Min water pressure bar 0 5 Test pressure bar 16 5 Ma...

Страница 10: ...10 FIGURE 3 1 ENCLOSURE INSTALLATION CLEARANCES mm FIGURE 3 2 PLANT ROOM INSTALLATION CLEARANCES mm 400 400...

Страница 11: ...ansion vessels using an internal diaphragm for sealed hot water heating systems BS 5440 1 2008 Installation and maintenance of flues and ventilation for gas appliances of rated input not exceeding 70k...

Страница 12: ...r warranty 6 0 LOCATION 6 1 PLANT ROOM REQUIREMENTS The Lochinvar EcoKnight may only be installed in a room that complies with the appropriate ventilation requirements The Lochinvar EcoKnight can be u...

Страница 13: ...utralising 4000 litres of condensate to a pH of 7 0 before releasing it to a drain 7 0 GAS SUPPLY The Lochinvar EcoKnight range is suitable for use on second and third family gasses 2H G20 20mbar and...

Страница 14: ...SITIONS Location Description EKB45CE EKB60CE EKB85CE EKB235CE A Directly below an opening air brick opening windows etc 300 2000 B Above an opening air brick opening windows etc 300 1000 C Horizontall...

Страница 15: ...ncludes the boiler connections concentric adaptor if required flue pipes air ducts if required and terminals If discharging at low level a suitable flue guard must be installed Due to the condensing n...

Страница 16: ...8 2 FLUE CONNECTION DETAILS EKB45CE EKB60CE ITEM DESCRIPTION 1 Flue Gas Test Point 2 Concentric Adaptor 3 90 Elbow 4 80mm Dia x 250mm Length 5 Air Intake Transition 6 Intake Connection Reducer 7 Exhau...

Страница 17: ...on Item 5 in Figure 8 2 into the intake connection reducer Item 6 and tighten the worm drive clip 4 To the bottom exhaust connection of the concentric adaptor Item 2 in Figure 8 2 fit the 80mm dia x 5...

Страница 18: ...E EKB145CE ITEM DESCRIPTION 1 Flue Gas Test Point 2 Concentric Adaptor 3 100mm Dia x 500mm Length 4 90 Elbow 5 Exhaust Transition 6 Intake Connection 7 Air Intake Transition TABLE 8 3 FLUE CONNECTION...

Страница 19: ...centre of the air intake connection and the concentric adaptor See Figure 8 5 5 Remove the 100mm dia x 500mm length and cut the measured distance from the plain end See Figure 8 5 6 Insert the air in...

Страница 20: ...into the intake connection Item 1 and tighten the worm drive clip 8 7 4 EKB205CE EKB235CE FIGURE 8 7 FLUE CONNECTION DETAILS EKB205CE EKB235CE ITEM DESCRIPTION 1 Intake Connection 2 Air Intake Transi...

Страница 21: ...um distances as detailed in Figure 8 1 Table 8 1 and the relevant British Standards 2 Taking care to protect the appliance from debris and dust drill a hole in the desired location The diameter of the...

Страница 22: ...fing material Extra care should be taken to ensure that the hole is drilled vertically 4 Install the roof flashing and secure as appropriate 5 Carefully insert the roof terminal through the roof flash...

Страница 23: ...ocedure for a Type C33 terminal should be followed To install a horizontal Type C53 terminal or air inlet the following procedure should be followed To install a Type C53 terminal or air inlet the pro...

Страница 24: ...2 EKB115CE 117 2 105 6 212 424 318 530 424 636 530 1060 636 1166 742 1272 EKB145CE 146 5 132 0 264 528 396 660 528 792 660 1320 792 1452 924 1584 EKB175CE 175 8 158 4 318 636 477 795 636 954 795 1590...

Страница 25: ...tably sized low velocity header is available from Lochinvar Limited as ancillary item 10 2 OPEN VENTED SYSTEM ARRANGEMENT The Lochinvar EcoKnight can be used in an open vented arrangement provided tha...

Страница 26: ...49 2 65 3 66 2 47 3 04 2 20 2 47 Boiler primary system piping based on 6 meters of piping 4 90 elbows and 2 fully ported ball valves TABLE 10 2 SYSTEM TEMPERATURE RISE CHART Includes Primary Piping 11...

Страница 27: ...onnections see Section 11 3 LOW VOLTAGE CONNECTION STRIP and then controlled via the external control connections The voltage input can be used to control the setpoint of the boiler of the firing rate...

Страница 28: ...d 2 to control the output from the boiler This connection is not polarity sensitive CN2 3 4 DHW THERMOSTAT An on off type thermostat located in an indirect calorifier can be connected to terminals 3 a...

Страница 29: ...f a knockout is removed by mistake the resulting hole must be blocked with an appropriate anchor plug or grommet to prevent accidental access to the live parts within the boiler 11 4 FUSES The EcoKnig...

Страница 30: ...14 INTERFACE PC X3 HIGH VOLTAGE LOW VOLTAGE 230 VAC X8 TR1 GND GND GND GND N L N L N L COM 24 VAC CN5 2 CN5 4 CN5 3 HIGH VOLTAGE SPARK LEAD CAUTION HI LIMIT AUTO RESET CONTROL EXTERNAL R GY BL X6 6 X...

Страница 31: ...STRIP TERMINAL STRIP TERMINAL FAN HIGH VOLTAGE SPARK LEAD CAUTION HIGH VOLTAGE LOW VOLTAGE 230 VAC CONTROL INTEGRATED JUNCTION BOX GROUND INTEGRATED CONTROL ROD SPARK FLAME ROD X1 7 TR1 1 25A F3 3 5A...

Страница 32: ...OL 12 1 GENERAL The Lochinvar EcoKnight uses the SMART SYSTEM control interface The control panel display give information on set up system status and diagnostic data in words rather than codes 12 2 S...

Страница 33: ...sending spark voltage to the ignition electrode and opening the gas valve BLR IGNITION OUT 77 4C 82 5 If the control does not detect flame by the end of the trial for ignition the control performs a 1...

Страница 34: ...rol does not detect the inlet sensor SHORTED The inlet sensor wires or the sensor itself has become shorted RISE C The difference between the inlet temperature and the outlet temperature Press the Nex...

Страница 35: ...een turned off by the Enter Reset button on the Smart System display Cas Standby The Master boiler has not received a call for heat from a remote thermostat Cas 61 4C 65 The Cascade is now active The...

Страница 36: ...rsonnel involved are aware of what action is about to be taken and begin by making the following checks 1 Flueway passages are clear 2 Adequate ventilation exists in the plant room if necessary 3 The...

Страница 37: ...bustion figures should be as follows Model No CO2 CO EKB45CE 9 0 0 5 100 ppm EKB60CE 9 0 0 5 100 ppm EKB85CE 8 8 0 5 100 ppm EKB115CE 8 8 0 5 100 ppm EKB145CE 8 8 0 5 100 ppm EKB175CE 9 0 1 0 100 ppm...

Страница 38: ...stainless steel or copper The operation of the EcoKnight range on LPG Propane 3rd Family 3P is similar to that on Natural Gas 2nd Family 2H and the design and installation details described in the mai...

Страница 39: ...the stamping on the orifice disk is correct for the boiler see Table 14 1 Place the orifice into the black rubber grommet in the side of the gas valve ensuring the orifice and grommet are seated corre...

Страница 40: ...of the gas valve and replace it with the orifice from the kit Position and secure the orifice in the valve as shown in Figure 14 2 7 Reposition the gas valve against the venturi and replace the star d...

Страница 41: ...the 4 cap head screws securing the gas valve to the venturi supporting the valve at all times 6 Separate the valve from the venturi inspect the sealing gasket and retain or replace as necessary 7 Fit...

Страница 42: ...ng orifice from the O ring in the side of the injector plate and replace it with the orifice from the kit Position and secure the orifice in the injector plate as shown in Figure 14 4 7 Reposition the...

Страница 43: ...rrect for the boiler see Table 14 1 5 Fit the orifice plate ensuring its correct orientation see DETAIL A of Figure 14 5 6 Reinstall the four screws and nuts holding the adapter flange to the inlet of...

Страница 44: ...BLE MATERIALS AND FLAMMABLE VAPOURS AND LIQUIDS A competent person should check and ensure that the flue its support and terminal the ventilation to the boiler house safety valve drain pressure gauge...

Страница 45: ...y hand If any of the nuts seize the nut should gently be re tightened and additional release oil used 7 Withdraw the heat exchanger front plate and burner assembly from the heat exchanger complete wit...

Страница 46: ...e system open all bleed valves and allow any trapped air to escape 4 Follow the lighting instructions as detailed in Section 13 4 3 PROCEDURE FOR INITIAL LIGHTING 5 Check for water leakage and airlock...

Страница 47: ...he user menus By pressing the Up and Down buttons the various menu sets can be selected and then accessed using the Enter Reset button 16 2 MENU SET B TEMP SETTINGS 16 2 1 CH MINIMUM SETPOINT The CH m...

Страница 48: ...installer to set the unit to either maximum firing rate or minimum firing rate for the purpose of combustion analysis The delay sets the length of time the boiler will stay in the Service Mode if no k...

Страница 49: ...the Enter Reset button The temperature range of this parameter is 30 C to 30 C The default value is 21 C 16 5 3 WATER TEMPERATURE AT MINIMUM AIR TEMP When the outdoor air temperature drops to the mini...

Страница 50: ...ther time period the set point will be increased again This will continue until either the CH demand ends a maximum of 20 increases has occurred or the maximum set point has been reached Once the CH d...

Страница 51: ...e are six 6 limiting steps used to limit temperature overshoot and short cycles This feature can be turned on or off depending on the installation The control range of this parameter is as follows 0 O...

Страница 52: ...oilers in a Cascade When a boiler is commanded to fire by the Master boiler it will attempt to achieve this temperature at its outlet The Master boiler will limit the modulation of the last boiler to...

Страница 53: ...d then stored by pressing the Enter Reset button The time range for this parameter is 0 months to 36 months The default service interval is 12 months 16 9 2 SERVICE NOTIFICATION RUNNING HOURS When the...

Страница 54: ..._________________________________________________________________ __________________________________________________________________________________ ___________________________________________________...

Страница 55: ..._________________________________________________________________ __________________________________________________________________________________ ___________________________________________________...

Страница 56: ...56...

Отзывы: