Revision Notes:
Revision B (AW-I&O-Rev B) reflects the addition
of the Dungs information to the manual.
Revision C (AW-I&O-Rev C) reflects changes made to pages 30
and 31 (piping diagrams).
Revision D (AW-I&O-Rev D) reflects changes made to Model 199
orifice.
Revision E (AW-I&O-Rev E) reflects an additional LP warning on
page 13.
Revision F (ECO #C02407) reflects the addition of air inlet pipe
materials, air inlet, air pressure switch, flow switch, relief valve,
high altitude, new vent termination, Maintenance Section along
with updates made to the ladder and wiring diagrams.
Revision G (ECO #C02545) reflects the addition of references to
the safety shutoff testing and instructions, sediment trap, periodic
cleaning of screens in vent terminations, wall thickness for direct
vent terminations, removal of B149.2 references, approval of the
3" concentric vent kit for ULC-S636, the addition of the Scald
Warning Label and sidewall vent termination kit number correction.
Revision H (ECO #C02870) reflects the addition of a mixing valve
to the piping diagrams (FIG.’s 6-4 thru 6-8, pgs. 30 - 34).
Revision I (ECO #C02738) reflects edits made to the LP
Conversion Table for the new orifice on the 399 model (page 12)
along with edits made to Table 6C on page 29.
AW-I-O Rev I
1/09
Содержание 150 - 500
Страница 42: ...Installation Operation Manual 42 8 Field wiring Figure 8 3 Low Voltage Field Wiring Connections...
Страница 46: ...Installation Operation Manual 46 Figure 10 2 Operating Instructions Models 150 285 10 Start up...
Страница 47: ...Installation Operation Manual 47 10 Start up continued Figure 10 3 Operating Instructions Models 399 500...