Installation & Operation Manual
53
11
Operating information
(continued)
OPERATION
DISPLAY
1. Upon a call for heat, the control turns on the water heater pump.
WHR: Standby
OUT: 123.8F(129)
2. The control connects 120 VAC to the blower. The blower does not
run at this time.
• The flow switch must close before the control powers up the
blower.
• The manual reset high limit must be closed before the control
powers up the blower.
• If the unit is equipped with a solenoid valve and/or a vent
valve, they will be energized along with the blower.
• If the unit is equipped with a gas pressure switch, it must close
at this time.
• If there is an auxiliary device connected to the unit, the unit will
then provide 24 VAC to its enable relay. If the auxiliary device
has a proving switch, it must close before the sequence
continues.
WHR: Standby
OUT: 123.8F(129)
3. The control then starts a 10 second prepurge cycle.
WHR: PREPURGE
OUT: 123.9F(129)
4. Once the prepurge cycle is complete, and the blocked drain
switch and auto-reset high limit are closed, the control starts the
5 second trial for ignition by sending spark voltage to the spark
electrode and opening the gas valve.
WHR: IGNITION
OUT: 123.9F(129)
5. If the control does not detect flame by the end of the trial for
ignition, the control performs a 10 second postpurge, another
prepurge and tries to light the burner again. If the burner does
not light after 4 trials (1 trial on the 500 model), the control locks
out for 1 hour and then tries another set of 4 trials, except on
the 500 model which is manual reset lockout.
WHR: POSTPURGE, PREPURGE
OUT: 123.9F(129)
6. If the control detects a flame before the trial for ignition ends, it
begins to modulate the burner in order to maintain the set point.
WHR: RUN 20% RATE
OUT: 124.8F(129)
7. Once the call for heat is satisfied, the control will turn off the burner.
The blower will remain on for the 10 second postpurge cycle. The
water heater pump will continue to run for its respective pump
delay time, then turn off.
WHR: POSTPURGE
OUT: 127.4F(129)
8. Water heater pump off.
WHR: Standby
OUT: 124.7F(129)
Sequence of operation
Содержание 150 - 500
Страница 42: ...Installation Operation Manual 42 8 Field wiring Figure 8 3 Low Voltage Field Wiring Connections...
Страница 46: ...Installation Operation Manual 46 Figure 10 2 Operating Instructions Models 150 285 10 Start up...
Страница 47: ...Installation Operation Manual 47 10 Start up continued Figure 10 3 Operating Instructions Models 399 500...