
APPENDIX
94
B-3 Installation
1. Make sure all power to the RAID storage is disconnected.
2. Install the “six eaves copper pillars” on the three mounting
position (NH1, NH2 and NH3) and secures it using round
head screws.
3. Connector J1 is available for the optional battery backup
module. Connect the BBM cable from this connector to the
12-pin (J6) battery connector on the RAID storage controller.
4. Integrators provide pre-drilled holes in their cabinet for secur-
ing the three “six eaves copper pillars” on the BBM using
round head screws.