29
GB/IE
Drill two holes (Ø 8 mm) and insert the wall plugs
24
. Screw the
bracket
4
with the help of the screws
23
and check the tight fit.
Loosen the cable gland
7
and terminal cover
6
, then run the con-
nection cable (not include in the product), type H05RN-F 3G 1.0 mm
2
,
through the cable gland
7
and terminal cover
6
to the screwless
connection terminal
5
. The suitable length for the connecting wires
please refer to Fig. C.
Insert the connection cable into the holes of the screwless connection
terminal
5
. Pay attention to the markings on the screwless connec-
tion terminal
5
(L for live, N for neutral and for the earth wire)
(Fig. C).
Make sure each wire of the connection cable is completely insert into
the end of the holes of the terminal and further check the security fixed.
Then lock the terminal cover
6
and cable gland
7
again.
Now attach the LED spotlight
2
to the bracket
4
using the included
locking screws
3
, spring washers
27
, flat washers
26
and tooth
lock washers
25
(Fig. D).
Adjust the product into the desired direction. For this, you may need
to slacken the locking screws
3
between the bracket
4
and the
LED spotlight
2
. After adjustment, tighten the locking screws
3
again, to ensure a secure hold.
After the fuse has been inserted or the fuse panel is switched on
again, your product is ready for use.
Operation
You can operate the product by using the included remote control
8
.
Note:
Remove the insulating strip from the battery compartment
22
before using the remote control
8
for the first time.
Note:
The product is preset to continuous light mode.
Содержание 319420 1901
Страница 3: ...A 8 9 10 11 6 5 13 15 16 12 14 17 1 2 3 4 18 19 7...
Страница 4: ...CR2025 OPEN PUSH RELEASE B C 5 5 20 21 22 6 7...
Страница 110: ...D 7 23 24 4 25 26 27 6 5 3...