
18
79
Step 6:
The following steps will guide you through the Fort Assembly.
Step 7:
Insert (4) Nuts (N02) into Tower Leg (003) with the metal warning plates as shown.
Orient the Tower Leg with the (3) holes facing up for use in a later step.
Step 128:
Attach (2) Window Box Fronts (065) to the Front Box Supports using (8) Screws (S91).
Complete this step 3 times.
Step 129:
Align (1) Window Box Assembly with the predrilled holes on the Wall Boards (067).
90°
90°