INSTALLATION
Typical Installation
4
INSTALLATION
Typical Installation
3
10
2
4
6
8
11
1
5
7
9
12
1. Gate Valve
4. Switch Power
7. Discharge
10. Caulking Hub
2. Check Valve
5. Pump Power
8. Gas Tight Basin
11. Air Bleed Hole
3. Union
6. Vent
9. Intake
12. Tethered Float (Refer to
“Specifications” on page 1
.)