Little Cottage Sweetbriar Cottage Скачать руководство пользователя страница 3

Construction Manual                               

© 2007 Little Cottage Co.

Page

The Sweetbriar Cottage

1

5

6

Locate the first side panel, set flush with the edge of 

floor, and secure by driving a 2½” screw through lower 

plate and into floor.  Additionally, drive screws at the 

opposite corner and at the center 2X.

Set the opposite panel in place and secure in a similar 

manner.

Locate rear panel, set in place, and apply pressure to 

ensure proper fit between side panels.  Secure along 

the bottom (inside) 2X per step #2.

Verify that top corners are flush and drive 2½” screws 

at top (as above), in the middle, and at the bottom of 

corners.

3

2

4

7

8

Thank you for 

purchasing from Little 

Cottage Co

!  You will 

find all components 

necessary to complete 

your Sweetbriar 

Cottage in your kit.  

Please refer to your 

buy list for specific 

contents, which will 

vary by unit.

Screw locations on rear panel.

Locate front panel, noting that door and window are 

preset.  Set panel in place and secure to floor using 

2½” screws at each corner and beside each 2X. 

Drive 2½” screws at both sides of bottom corner near 

door.

2½” screws

Отзывы: