LiteSheet Solutions
Page
3
of
4
Installation
1.
Place endcaps between ceiling grid and existing
troffer.
2.
Slide LED panel between the grid and the existing
troffer. Fasten with quarter turns. Connect retrofit to
incoming power using NEC approved methods.