Follow these steps to install the POD Extension:

1. Verify that the proper POD Extension Model was

obtained by comparing the driver tang on the POD
Extension to the driver tang on the packing gland

that was removed in Step 5 of the 

Retrofit

Installations

 section of the 

Installation

 topic

above. There are two types of Packing Gland/POD
Extension driver tangs: blade type and fork type.
Blade type packing glands must be replaced with
blade type POD Extensions. Fork type packing
glands must be replaced with fork type POD
Extensions.

2. Install the POD Extension using the two screws

provided. There are two sets of holes in the POD

and the other is 1½" apart. Line up the holes with
the meter to determine which set to use. Tighten
the screws and torque them to 21-25 inch-pounds.

3. Once the POD Extension is in place, the POD may

be installed onto the POD Extension. Align the
POD Fork Tang with the internal POD Extension
Driver. Use the two screws provided to mount the
POD to the POD Extension using two of the tapped

wrench, tighten the screws and torque them to 21-
25 inch-pounds.

POD Wiring

WIRING CONDUIT SYSTEM

When wiring the POD, the wires must enter through the POD’s conduit hub. For explosion-
proof rated systems (Class I, Div 1), the wiring must be in explosion-proof rated rigid conduit,
or–for high vibration installations–explosion-proof rated braided flexible conduit. The conduit

15

Содержание POD1

Страница 1: ......

Страница 2: ...l Get the latest PDF manual Table of Contents Resources in this Guide 3 Publication Updates 3 Safety Procedures 4 General Information 6 Specifications 9 Dimensions 10 Regulatory Compliance Tag Marking...

Страница 3: ...ards present when using the Liquid Controls Meter on LP gas and other products The reading of these warnings and the avoidance of such hazards is strictly in the hands of the owner operators of the eq...

Страница 4: ...ess to appropriate fire extinguishers for your product Consult with your local fire department state and local codes to ensure adequate preparation Read this manual and all the literature provided in...

Страница 5: ...tions in accordance with the requirements of the authority having jurisdiction Peripheral equipment must be suitable for the hazardous location where it is installed L quipement p riph rique doit tre...

Страница 6: ...es the dynamic seal of the packing gland and isolates the electronics from the process fluid in the meter Inside the electronics compartment an optical shaft encoder converts the rotary motion into a...

Страница 7: ...ing 100 PPR Quad Pulser 9 to 30VDC POD3 Blade Drive with Buna N O Ring 100 PPR Quad Pulser 9 to 30VDC POD4 Blade Drive with PTFE O Ring 100 PPR Quad Pulser 9 to 30VDC POD5 Fork Drive with Buna N O Rin...

Страница 8: ...te K Factors and Volumetic Reference Data When initially calibrating a specific meter model the K Factor Pulses Unit values given below are for reference only and are not to be used as a final K Facto...

Страница 9: ...quare Wave Single channel output Channel A or channel B Quadrature channel output Channel A and channel Pulse Timing Nominal 50 on and 50 off Rise Fall Time of Pulse 5 s Output Current sinking 100 mA...

Страница 10: ...perature Range 40 to 176 F 40 to 80 C Humidity Range 0 100 non condensing Shock 50 G for 10 ms Vibration 1 G at 10 150 Hz Electromagnetic Compatibility EMI RFI etc POD with PC Board 84120 EU Directive...

Страница 11: ...EX Directive with a certificate number Presafe 18 ATEX 12438X and in 2011 to IECEx scheme with a certificate number IECEx DNV 11 0012X where X represents the following Special Conditions for Safe Use...

Страница 12: ...evaluated by UL for outdoor use to provide protection against water and dust and an increased level of protection against corrosion and that will be undamaged by the external formation of ice UL Liste...

Страница 13: ...Pulse Output Device 13 Get the latest PDF manual https www lcmeter com resources technical manuals Mobile online version of this manual https www lcmeter com manuals Bill of Materials...

Страница 14: ...Pulse Output Device 14 Get the latest PDF manual https www lcmeter com resources technical manuals Mobile online version of this manual https www lcmeter com manuals...

Страница 15: ...rocedure Relieving Internal Pressure Procedure for LPG and NH3 Meters 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close the manual valve in the supply line...

Страница 16: ...ed However when using conduit the hub should face down so moisture that may accumulate in the conduit will drain away from the POD electronics 3 Remove the mechanical counter adjuster and adjuster dri...

Страница 17: ...stallations section above There are two types of packing gland POD driver tangs blade type and fork type Blade type packing glands must be replaced with blade type PODs Fork type packing glands must b...

Страница 18: ...re applications The POD Extension is used to extend the connection away from the meter There are four POD Extension models available 49754 POD1 or POD5 Fork Drive with Buna N O Ring 49756 POD2 Fork Dr...

Страница 19: ...k type POD Extensions 2 Install the POD Extension using the two screws provided There are two sets of holes in the POD and the other is 1 apart Line up the holes with the meter to determine which set...

Страница 20: ...o maintain the hazardous location ratings on the product Use Ex d certified cable glands only For ambient temperatures above 70 C use field wiring rated 20 C above the maximum ambient temperature WIRI...

Страница 21: ...ward and reverse flow both channels which are in quadrature to each other must be used Channel A will lead Channel B by 90 in one flow direction and Channel B will lead Channel A in the reverse direct...

Страница 22: ...leading Channel B For reverse flow applications counterclockwise Channel B leads Channel A NOTE Quadrature channel voltage output is 90 out of phase with Channel B POD Wiring Schematics Single Channel...

Страница 23: ...www lcmeter com manuals Power Source Requirement An isolation source and overcurrent protective device rated 5A max must be installed in the power circuit If a 5A max isolation source and overcurrent...

Страница 24: ......

Отзывы: