TP0003B
BM METER
Chap 4
Page 1
INSTALLATION, OPERATION & MAINTENANCE
Chapter 4
INSTALLATION, OPERATION AND MAINTENANCE
CONTENTS
Para
Pre-installation
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Operation
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maintenance
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Storage
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Storage Of Water Meters
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After Storage
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
WARNINGS
WORK MUST BE CARRIED OUT ONLY BY SUITABLY QUALIFIED PERSONNEL.
PRIOR TO COMMENCING WORK, ENSURE THAT ALL AIRPORT/COMPANY SAFETY
PROCEDURES HAVE BEEN COMPLIED WITH.
1
PRE-INSTALLATION
1.1
Prior to installing a meter carry out the following procedures.
1.2
Flush and drain the body casing.
1.3
Drain the calibrating mechanism by first removing the drain plug and then the cover.
1.4
Thoroughly wash the calibrating mechanism with clean kerosene, refit the cover and drain plug.
1.5
Lubricate the calibrating mechanism with GREASE.
1.6
Refit and wirelock all drain plugs in the body casing.
2
INSTALLATION
2.1
The following notes are for guidance only, installation methods being dependent upon local
regulations and conditions.
Note
Plan space around the installed bulkmeter to allow removal of the rotor assembly for servicing.
2.2
Install the bulkmeter by suspending it in the pipeline by the manifold, this ensures that pipeline
stresses are not transmitted to the meter body. No attempt is to be made to support the meter body
in the installation by any other method.
2.3
When using jointing compound, apply to male threads only to prevent excess compound fouling the
meter mechanism.
2.4
Until all air has been eliminated from the system, the control valve must be opened slowly to prevent
the meter racing and exceeding its maximum rated speed.
Содержание Avery-Hardoll BM Series
Страница 3: ...TP0007 Page iv ...
Страница 5: ...TP0007 Page vi ...
Страница 7: ...TP0007 Page viii ...
Страница 9: ...TP0007 Page x ...
Страница 13: ...TP0003B BM METER Chap 1 Page 4 INTRODUCTION Intentionally left blank ...
Страница 43: ...TP0003B BM BULKMETER Chap 5 Page 14 SERVICING Intentionally left blank ...
Страница 56: ...TP0003B BM BULKMETER Chap 7 Page 11 SPARE PARTS INTENTIONALLY BLANK ...
Страница 65: ...TP0003B BM BULKMETER Chap 7 Page 20 SPARE PARTS Intentionally left blank ...
Страница 67: ...TP0003B Chap 7A Page 2 Intentionally left blank ...